Project Number: 228730 WWTE SCADA Upgrades
Issue Date: August 2017 Nashua, NH
H. Locations for the five desktop computers shall be in two new panels (Gallery
Computer panel, Pump Building panel), two existing panels (Wet Weather CP-21,
Sedimentation CP-31) and on desk in main office. For panels, install computers and
industrial monitors similar to detail as shown on Gallery Computer Panel drawing
(1-2800).
2.03 SOFTWARE UPGRADES AND REGISTRATION
A. Provide upgrade of all software packages as listed in Table 40 62 70-1 to current
editions. Coordinate upgrade of software packages using serial numbers from
Owner as listed. Provide desired “Designated for (After Upgrade)” use as tabulated.
Some items require a trade-in for other items. Bidder shall work with local
Rockwell Software vendor (Horizon Solutions) to determine costing of upgrades
and include with bid. Contact Owner or Engineer for additional clarifications if
necessary.
B. Register all software licenses to Owner
2.04 SOURCE QUALITY CONTROL
A. Provide in accordance with Division 01 General Requirements.
PART 3— EXECUTION (NOT USED)
END OF SECTION
SCADA COMPUTERS AND SOFTWARE
WOODARD & CURRAN 40 62 70-5