Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 6/7/2017 - P222

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P222

ITEM 618.7 - FLAGGERS
A. SCOPE

This work shall consist of furnishing qualified flaggers, as required to direct traffic through or
around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified flaggers as per the latest approved NHDOT Standard
Specifications for Road and Bridge Construction. Daily coverage needs to be approved by the
Engineer.

C. MEASUREMENT AND PAYMENT

Finance Committee - Agenda - 6/7/2017 - P221

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P221

ITEM 618.6 - UNIFORMED OFFICERS
A. SCOPE

This work shall consist of furnishing uniformed officers, with or without vehicles, as required to
direct traffic through or around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified uniformed officers as per the latest approved NHDOT
Standard Specifications for Road Construction. Uniformed officers shall only be used when the
Engineer has previously approved it. Daily coverage needs to be approved by the Engineer.

C. MEASUREMENT AND PAYMENT

Finance Committee - Agenda - 6/7/2017 - P220

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P220

C. MEASUREMENT AND PAYMENT
Payment for replacing existing castings shall be at the contract unit price specified for each. All
castings regardless of size will be paid for as one (1) each. The removed castings will remain the

property of the City of Nashua.

Contractor shall record the number and locations of castings replaced for each street. Payment is
contingent upon submittal of quantities in a per structure, and per street format.

20

Finance Committee - Agenda - 6/7/2017 - P219

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P219

ITEM 604.46 - REPLACE CASTING
A. SCOPE

This work consists of replacing triangular, small diameter, and broken manhole frames and
covers, and catch basin frames and grates as shown on the drawings or as directed by the
Engineer. Any repair needed to the existing structure within the 12 inches below the bottom of
the casting shall be included and performed under this item. Any further repair needed to the
existing structure shall be performed under Item 604.4.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 6/7/2017 - P218

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P218

ITEM 604.45 - ADJUSTING TO GRADE EXISTING CASTINGS
A. SCOPE

This work consists of adjusting castings to the new final overlay elevation as shown on the
drawings or as directed by the Engineer. Any repair needed to the existing structure within the 12
inches below the bottom of casting shall be included and performed under this item. Any further
repair needed to the existing structure shall be performed and paid under item 604.4 Repair of
Existing Structures.

B. MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 6/7/2017 - P217

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P217

ITEM 604.4 - REPAIR OF EXISTING STRUCTURES
A. SCOPE

This work consists of repairing existing structures below 12” from the bottom of existing casting
frame.

B. MATERIALS AND CONSTRUCTION

The contractor shall include all labor, materials, equipment, and transportation necessary to
repair existing structures other than within the top 12 inches below the bottom of casting frame.
Repairs in that section shall not be paid under this item.

Finance Committee - Agenda - 6/7/2017 - P216

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P216

" 8% polyester reinforcing fibers

Finance Committee - Agenda - 6/7/2017 - P215

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P215

Preparation and Placement of Sealant

No crack sealant material shall be applied in wet cracks or where frost, snow or ice is present,
nor when the ambient temperature is below 25 degrees F.

Finance Committee - Agenda - 6/7/2017 - P214

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P214

* At temperatures ranging from ambient to maximum finished product mix
temperature
** Subject to Normal Variations

The modified asphalt-fiber compound shall be mixed at a rate of 8% fiber weight to weight of
asphalt cement. This compound having the same chemical base provides compatibility and
exhibits excellent bond strengths. The fiber functions to re-distribute high stress and strain
concentrations that are imposed on the sealant by thermal sources, traffic loading, etc.

C. EQUIPMENT

Finance Committee - Agenda - 6/7/2017 - P213

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P213

ITEM 405.11 - CRACK SEALING

A. SCOPE

The work covered by this section of the specification consists of furnishing all materials, labor,
transportation, and equipment necessary to perform all operations in connection with the
cleaning and sealing of construction and random cracks in bituminous concrete pavements,
including vegetation removal and sterilization of cracks, where necessary.

B. MATERIAL

Pagination

  • Previous page ‹‹
  • Page 1427
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact