Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 2/17/2021 - P67

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P67

32

Appendix B

list of mpaied Waters
Storm System Mapping

Nashua has completed all mapping associated with Phase I and the majority of the mapping associated
with Phase II. The information is readily available via the following website:

https://www.nashuanh.gov/155/GIS-Maps

Finance Committee - Agenda - 2/17/2021 - P66

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P66

§ 190-217 § 190-218

of noncompliance with site plan approval, subject to
enforcement as outlined under § 190-157.

(2) The owner shall ensure that an annual report is provided to
the Planning Department on or before the first day of January
of each year. Such reports shall, at a minimum, include:
[Amended 6-26-2018 by Ord, No. O-18-015]

(a) The location of the property;
(b) The name, address, and phone number of the owner;

Finance Committee - Agenda - 2/17/2021 - P65

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P65

§ 190-217 § 190-217

which provide that the obligations of the maintenance plan
Tun with the land. [Amended 6-26-2018 by Ord. No.
O-18-015]

(2) The owner shall file with the registry of deeds such legal
instruments as are necessary to allow the City or its designee
to inspect or maintain the stormwater management systems
for compliance with the O&M plan.

Finance Committee - Agenda - 2/17/2021 - P64

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P64

§ 190-215 § 190-217

K. Litter, debris, yard waste, and all other nonstormwater
discharges except for those listed in Subsection J above are
prohibited. [Added 6-26-2018 by Ord. No. O-18-015]

§ 190-216. Easements.

Where a subdivision is traversed by or requires the construction of a
watercourse or a drainage way, an easement of adequate width shall
be provided for such purpose.

§ 190-217. Operation and maintenance plans.

Finance Committee - Agenda - 2/17/2021 - P63

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P63

§ 190-215 § 190-215

to the MS4. If these discharges are identified as significant
contributors to the MS4, they must be addressed in the illicit
discharge detection and elimination minimum contro] measure
described. [Added 6-26-2018 by Ord. No. O-18-015]

(1) Water line flushing;
(2) Landscape irrigation;
(3) Diverted stream flows;
(4) Rising groundwaters;

(5) Uncontaminated groundwater infiltration [as defined at 40
CFR 35.2005(20)];

(6) Uncontaminated pumped groundwater;

Finance Committee - Agenda - 2/17/2021 - P62

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P62

§ 190-215 § 190-215

(6)

All temporary erosion and sediment control measures shall be
removed after final site stabilization. Trapped sediment and
other disturbed soil areas resulting from the removal of
temporary measures shall be permanently stabilized within
30 days.

I. Stormwater management measures.

(1)

(2)

(3)

(4)

J.

Finance Committee - Agenda - 2/17/2021 - P61

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P61

§ 190-215 § 190-215

(2)

(3)

(4)

(5)

[2] Drainage locations which serve 10 or more disturbed
acres at one time and where temporary sediment
basins or equivalent controls are not attainable,
smaller sediment basins and/or sediment traps should
be used. At a minimum, silt fence, vegetative buffer
strips, or equivalent sediment controls are required
for all downslope boundaries (and for those side slope
boundaries deemed appropriate as dictated by
individual site conditions).

Finance Committee - Agenda - 2/17/2021 - P60

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P60

§ 190-215

(o)
(p)

(q)

(r)
(s)
(t)

(u)

§ 190-215

Highlighted areas of poorly and very poorly drained soils.

Highlighted areas of poorly and/or very poorly drained
soils proposed to be filled.

Location, descriptions, details, and design criteria and
calculations for all structural, nonstructural, permanent,
and temporary erosion and sedimentation control
measures and BMPs.

Identification of all permanent control measures.
Identification of permanent snow storage areas.

Finance Committee - Agenda - 2/17/2021 - P59

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P59

§ 190-215 § 190-215

G. Redevelopment. Redevelopment of previously developed sites
must meet the stormwater management standards to the
maximum extent possible to be determined by the Planning
Board. The goal is to reduce impervious area by a minimum of
20% or meet the open space requirement in that zoning district.
The application shall include a certification by a registered
professional engineer as to compliance with this standard.
[Amended 6-26-2018 by Ord. No. O-18-015]

Finance Committee - Agenda - 2/17/2021 - P58

By dnadmin on Mon, 11/07/2022 - 13:47
  • Read more about Finance Committee - Agenda - 2/17/2021 - P58

§ 190-215 § 190-215

(2)

(3)

(4)

(l) The service, repainting, and hull maintenance areas of
marinas.

The following measures are required in addition to BMPs
described in Subsection E(1) above, within areas with high
potential pollutant loads:

(a) Source reduction; and
(b) Pretreatment.

The following are prohibited within areas with high potential
pollutant loads located in a Conservation Zone:

(a) Infiltration trenches;
(b) Infiltration basins; or
(c) Dry wells.

Pagination

  • Previous page ‹‹
  • Page 143
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact