32
Appendix B
list of mpaied Waters
Storm System Mapping
Nashua has completed all mapping associated with Phase I and the majority of the mapping associated
with Phase II. The information is readily available via the following website:
https://www.nashuanh.gov/155/GIS-Maps
Some remaining assets have yet to be mapped. This includes open channels, municipally owned
treatment structures, and final catchment delineations. A fly-over was completed on April 29, 2019.
Information provided by the fly-over will be used to create GIS layers showing treatment structures and
open channels. The fly-over data will also assist in the refined catchment delineations. The municipally-
owned treatment BMPs were inspected and field verified in 2020.
Hic it Discharge Detection and Himination Plan 82