Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee

Finance Committee

Finance Committee - Agenda - 5/17/2017 - P456

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P456

~
L l Ls
ROAD RESTORATION:
TEMPORARY
2" TEMP PAVE
FINAL
12" GRAVEL
2.25" BASE
RETAIN EXISTING SMH- $1505
EPLACE 12" TILE PIPE FOR 12"IPVC PIPE
LIMIT OF WORK Ne
/ | | /
; ; ; f
j 1 ;
Oo 4 —wamas UEMES—— =F ao s3959-——uawas—_L>-_~a aol S ae 0
\ \ ———_——— LIMIT OF WORK
\ ROW LINE
RETAIN EXISTING SMH-S1019
REPLACE SEWER SERVICE CONNECTION TO ROW.
MATGH EXISTING PIPE SIZE, 6" (TYP.) MIN. LOGATION
IS APPROXIMATE AND LENGTH IS UNKNOWN

Finance Committee - Agenda - 5/17/2017 - P455

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P455

ROAD RESTORATION
TEMPORARY
3" TEMP PAVE
FINAL
18" GRAVEL
5.5" BASE, TWO LIFTS
1.5" TOP

ae REMOVE 20 FT OF 8" CLAY PIPE

AND REPLACE WITH 8" PVC
PIPE ( ITEM 2b)

MAIN ST- REMOVE AND REPLACE PIPE @ TAYLOR ST

ROAD RESTORATION
TEMPORARY
3" TEMP PAVE
FINAL
18" GRAVEL
5.5" BASE, TWO LIFTS
1.5" TOP

REPLACE 12 LF OF DRAIN
PIPE; ITEM 2b.

Finance Committee - Agenda - 5/17/2017 - P454

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P454

ROAD RESTORATION
MAIN ST
TEMPORARY
3" TEMP PAVE
FINAL
18" GRAVEL
5.5" BASE, TWO LIFTS

REMOVE 13 FT OF 8" CLAY PIPE AND 1.5" TOP ($" STONE)
REPLACE WITH 8" PVC PIPE (ITEM 2b)

MONTGOMERY AVE
TEMPORARY

2" TEMP PAVE
PROPOSED STRONG BACK FINAL

COUPLING 5' FROM SMH 18" GRAVEL

2..25" BASE

1.5" INTERMEDIATE (3" STONE)
e r PROPOSED DROP OVER MH 1.5" TOP 3" STONE)

Finance Committee - Agenda - 5/17/2017 - P453

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P453

PERFORM ROOT CUTTING IN 18" TILE PIPE, 4'
FROM SMH- $1318 OR 93' FROM SMH- $1313;
ITEM 28(18M). SEE FIGURE 2.

eee PERFORM ROOT CUTTING IN 12" TILE PIPE;

ITEM 2S8(12m).

PERFORM POINT REPAIR LINING
2.5 FT FROM SMH-S1312 ;

USMH: SMH-S1312,
DSMH: SMH-S1313 \

a a
Va
M

“+ -* - a ne :
° 4 . — _
a = on ee |

io Lo :
a Te
Broken Pipe Soil Visible

7a Be

FIGURE 1: ROOT CUTTING AT FOSSA AVE

Oe ee BO
DSMH: SMH-$1318

Finance Committee - Agenda - 5/17/2017 - P452

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P452

ROAD RESTORATION
TEMPORARY

3" TEMP PAVEMENT
FINAL

18" GRAVEL

5.5" BINDER

1.5" TOP

USE ITEM 6s, REMOVAL AND DISPOSAL OF
6" CONCRETE UNDER PAVEMENT AS
NECESSARY.

REPLACE 15" PIPE
WITH 11' +/- OF 15" PVC

SHORT LINER CIPP CIPP LINE 33' +/- OF 12" PIPE
existing ah NX REPLACE CB- D14541 & CONNECTING

LINE EXISTING SMH-S9624. PIPE. INSTALL 13' +/- OF 10" DIA

Finance Committee - Agenda - 5/17/2017 - P451

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P451

‘
m ROAD RESTORATION
rc s TEMPORARY
a 3" TEMP BASE
FINAL
12" GRAVEL
3" BASE
+ CONNECT TO EXISTING SMH-S2685 2" TOP
ROW LINE (REPLACED IN 2002) WITH EXISTING
HOLE. ITEM ‘th. o
LIMIT OF WORK =
REPLACE 12" CONCRETE 1 |
[ PIPE WITH 12" PVC PIPE | =
tn
a g
a
CSEWER memes SEV E i
ween SEWER semanas SEV)
ERommemmes SEWER
meseensenjoneses SF
1 WERemen snesee__! —t_-
4' DIA o
| SMH-2669 2
a
Oo
\ 2

Finance Committee - Agenda - 5/17/2017 - P450

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P450

c ‘
28 us ROAD RESTORATION:
2 7 5 N2& TEMPORARY
Oo m INSTALL NEW CB- LEMO 2" TEMP PAVE
“j = “INSTALL 8 LF + OF 10" REPLACE CB- D10952
- ove SEO EIRE CONNECTING PIPE. INSTALL 16 LF FINAL
* + OF 10" DIA PVC DRAIN PIPE 12" GRAVEL
RETAIN EXISTING SMH- $2968 INSTALL NEW #' DIA 2.25" BASE
SMH- LEMON 1
LIMIT OF WO
REMOVE EXITING 10"
CONCRETE PIPE
/ fF INSTALL 12" PVC PIPE
[ S 7 d | =
pees} 2] /\/\ 1S ees SAS —*

Finance Committee - Agenda - 5/17/2017 - P449

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P449

c ‘
ROAD RESTORATION:
TEMPORARY
2" TEMP PAVEMENT
FINAL
12" GRAVEL
2.25" BASE
ROW LINE REPLACE SERVICE CONNECTION TO ROW LINE,
MATCH EXISTING PIPE CONNECTION SIZE, 6" MIN. REPLACE CBIACKSONI &
LOCATION IS APPRO —
LIMIT OF WORK UNKNOWN. CYP) XIMATE AND LENGTH IS CONNECTING PIPE. INSTALL 8 LF + OF
10" PVC DRAIN PIPE.
LIMIT OF WORK
} |’ \ /
L
0+00 | 1 2 |
| WER sees} SEWER SE EReeene SEWER rN
| 2+90.40
|
XC INSTALL 12" PVC PIPE

Finance Committee - Agenda - 5/17/2017 - P448

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P448

f ‘
ROAD RESTORATION:
TEMP
2" TEMP PAVE
FINAL
12" GRAVEL
2.25" BINDER
REPLACE EXISTING SMH-S2554 REPLACE SEWER CONNECTION, MATCH
EXISTING PIPE SIZE, 6" MIN. LOCATION IS
APPROXIMATE & LENGTHG IS UNKNOWN
PLACE CB-14382 & CONHECTING PIPE.
INSTALL 18 + OF 10" PVC DRAIN PIPE
I
~
lu
FE
li
n
1 2 3 34+07.71
_ | © O— SEWER =e =a SEWER SEWER sees SEWER ee SEWER re - ©G—bD
INSTALL 12" PVC PIPE
ROW LINE /

Finance Committee - Agenda - 5/17/2017 - P447

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P447

505.45

LINE 24" CONCRETE PIPE

REPLACE CB - D14390 &
CONNECTING PIPE. INSTALL 24' +/-
OF 10" DIA PVC DRAIN PIPE

REPLACE 15" CONCRETE PIPE
WITH 12' +/- OF 15" DIA PVC

LINE EXISTING SMH - $2568

REPLACE SEWER LINE WITH
6" PVC. LOCATION IS APPROXIMATE
& LENGTH IS UNKNOWN.

LINE 24" CONCRETE PIPE

FILL. (ITEM 2m)

- ABANDON 15” CONCRETE
PIPE. FILL WTIH FLOWABLE

Pagination

  • Previous page ‹‹
  • Page 1333
  • Next page ››
Subscribe to Finance Committee

Footer menu

  • Contact