Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Finance Committee - Agenda - 5/17/2017 - P454

Finance Committee - Agenda - 5/17/2017 - P454

By dnadmin on Mon, 11/07/2022 - 10:26
Document Date
Wed, 05/17/2017 - 00:00
Meeting Description
Finance Committee
Document Type
Agenda
Meeting Date
Wed, 05/17/2017 - 00:00
Page Number
454
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/fin_a__051720…

ROAD RESTORATION
MAIN ST
TEMPORARY
3" TEMP PAVE
FINAL
18" GRAVEL
5.5" BASE, TWO LIFTS

REMOVE 13 FT OF 8" CLAY PIPE AND 1.5" TOP ($" STONE)
REPLACE WITH 8" PVC PIPE (ITEM 2b)

MONTGOMERY AVE
TEMPORARY

2" TEMP PAVE
PROPOSED STRONG BACK FINAL

COUPLING 5' FROM SMH 18" GRAVEL

2..25" BASE

1.5" INTERMEDIATE (3" STONE)
e r PROPOSED DROP OVER MH 1.5" TOP 3" STONE)

POINT REPAIR LINING 6" PIPE 15 FT
FROM CB. ITEM 1L(6).

PROPOSED DROP OVER MH
55' FROM SMH AT MAIN ST

REPLACE 75 LF OF EXISTING 10"
TILE PIPE WITH 10" PVC PIPE

MAIN ST- POINT REPAIR @ LINCOLN AVE MAIN ST- REMOVE AND REPLACE PIPE @ MONTGOMERY AVE
SCALE: 1" =20' SCALE: 1" =20'
\ J
f VE a 20 0 50 40 30 VE NASHUA, NEW HAMPSHIRE nm ance)
CITY OF NASHUA NEW HAMPSHIRE a PLAN OF pear
CITY ENGINEER'S OFFICE HORIZONTAL SCALE IN FEET 2017 SEWER PROJECT =
9 RIVERSIDE STREET Sole 20e" PROPOSED WORK / SHEET
NASHUA. NEW HAMPSHIRE 03062 DRAWN BY: DESIGNED BY: REVIEWED BY: MAIN ST - SOUTH 2 14
JUNO. REVISION DESCRIPTION DATE J N. QUINTERO J. MENDOLA J. MENDOLA JU \ oF 24 J

Page Image
Finance Committee - Agenda - 5/17/2017 - P454

Footer menu

  • Contact