Finance Committee - Agenda - 2/1/2017 - P246
Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 5 of 9
August 2016
3066.07
C.
Prior to backfilling trench CONTRACTOR shall obtain as-built top of pipe
coordinates and elevations at grade changes, terminations, fittings, and at least
every 50 ft along the pipe.
3.2. INSTALLATION
A.
B.
Trench, backfill, and compact in accordance with Specification Section 02200.
Heat Fusion of Pipe:
1.