Board Of Aldermen - Agenda - 4/12/2022 - P223

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P223

B. The Contractor shall protect the sub-grade beneath new structures and pipes from
frost penetration when freezing temperatures are expected.

PART 2 - PRODUCTS

2.01 MATERIAL:

A. CRUSHED GRAVEL:
The Gravel Road Base will be NHDOT - Item 304.3 Crushed Gravel, or Item 304.4
Crushed Stone (Fine Gradation).

Board Of Aldermen - Agenda - 4/12/2022 - P222

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P222

ASTM D2922 ~=Test Methods for Density of Soil and Soil-aggregate in Place
by Nuclear Methods (Shallow Depth).

1.04 SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF
GENERAL SPECIFICATIONS, SUBMIT THE FOLLOWING:

Material test results performed by a certified laboratory shall be submitted to the
Engineer for all materials proposed for use on the project. If required by the
Engineer, samples shall be submitted for independent testing.

1.05 PROTECTION OF EXISTING PROPERTY:

Board Of Aldermen - Agenda - 4/12/2022 - P221

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P221

SECTION 02300

EARTHWORK

PART 1 - GENERAL

1.01

1.02

>

G5 Oo 8

1.03

WORK INCLUDED:

The Contractor shall make excavations of normal depth in earth for trenches and
structures, shall backfill and compact such excavations to the extent necessary,
shall furnish the necessary material and construct embankments and fills, and shall
make miscellaneous earth excavations and do miscellaneous grading.

RELATED WORK:

Section 01110, CONTROL OF WORK AND MATERIALS

Board Of Aldermen - Agenda - 4/12/2022 - P220

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P220

PART 3 — EXECUTION

3.01 INSTALLATION:

A. Work shall not be started until all materials and equipment necessary for their
construction are either on the site of the work or satisfactorily available for
immediate use as required.

B. _ The sheeting shall be securely and satisfactorily braced to withstand all pressures to
which it may be subjected and be sufficiently tight to minimize lowering of the
groundwater level outside the excavation.

Board Of Aldermen - Agenda - 4/12/2022 - P219

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P219

SECTION 02252
SUPPORT OF

EXCAVATION

PART 1 - GENERAL

1.01

A.

WORK INCLUDED:

This section of the specification covers sheeting and bracing for support of
excavations. The requirements of this section shall also apply, as appropriate, to
other methods of excavation support and underpinning which the Contractor elects to

use to complete the work.

Board Of Aldermen - Agenda - 4/12/2022 - P218

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P218

3. Footage counter
4. Test pressure
5. Sewer reach identification (street location, start MH and second MH)

D. PIPE DEFLECTION MEASUREMENT:

Board Of Aldermen - Agenda - 4/12/2022 - P217

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P217

No pipe or fitting shall be permanently supported on saddles, blocking, or stones.

Branches and fittings shall be laid by the Contractor as indicated on the drawings, and/or as
directed by the Engineer. Open ends of pipe and branches shall be closed with PVC caps
secured in place with pre-molded gasket joints or as directed by the Engineer.

Board Of Aldermen - Agenda - 4/12/2022 - P216

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P216

flexible repair couplings, or approved equal, of the appropriate size to fit the external
diameter of each pipe.

B. SEWER AND DRAIN PIPE BEDDING AND SAND BLANKET:
Sewer pipe bedding and sand blanket shall be as specified in Section 02300 EARTHWORK.
C. DUCTILE IRON PIPE:

Ductile iron pipe shall be used at sewer/water line crossings and conform to AWWA
C151/A21.50 & 51, Class 52.

D. SEWER SERVICE SADDLES:

Board Of Aldermen - Agenda - 4/12/2022 - P215

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P215

B. New Hampshire Code of Administrative Rules, Env-Wq 704, Design of Sewerage.

1.04 SUBMITTALS:
In accordance with requirements of the General Specifications submit six (6) sets of
manufacturer's literature of the materials of this section shall be submitted to the Engineer for
review.

PART 2 - PRODUCTS

2.01 MATERIALS:

A. PVC NON-PRESSURE SEWER PIPE:

Board Of Aldermen - Agenda - 4/12/2022 - P214

By dnadmin on Mon, 11/07/2022 - 07:45
  • Read more about Board Of Aldermen - Agenda - 4/12/2022 - P214

SECTION 02085

POLYVINYL CHLORIDE GRAVITY PIPE AND FITTINGS

PART 1 - GENERAL

1.01 WORK INCLUDED:
This section covers the furnishing and installation of Polyvinyl Chloride (PVC) pipe and
fittings for sewer mains, sewer service connections and drain laterals to catch basins, as
indicated on the drawings and as specified herein.
1.02 RELATED WORK:
A. Section 01330, SUBMITTALS
B. Section 02252, SUPPORT OF EXCAVATION
C. Section 02300, EARTHWORK

D. Section 02518, TRACER TAPE