Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen - Agenda - 4/12/2022 - P221

Board Of Aldermen - Agenda - 4/12/2022 - P221

By dnadmin on Mon, 11/07/2022 - 07:45
Document Date
Fri, 04/08/2022 - 13:45
Meeting Description
Board Of Aldermen
Document Type
Agenda
Meeting Date
Tue, 04/12/2022 - 00:00
Page Number
221
Image URL
https://nashuameetingsstorage.blob.core.windows.net/nm-docs-pages/boa_a__041220…

SECTION 02300

EARTHWORK

PART 1 - GENERAL

1.01

1.02

>

G5 Oo 8

1.03

WORK INCLUDED:

The Contractor shall make excavations of normal depth in earth for trenches and
structures, shall backfill and compact such excavations to the extent necessary,
shall furnish the necessary material and construct embankments and fills, and shall
make miscellaneous earth excavations and do miscellaneous grading.

RELATED WORK:

Section 01110, CONTROL OF WORK AND MATERIALS

Section 02085, POLY VINYL CHLORIDE GRAVITY PIPE AND FITTINGS
Section 02252, SUPPORT OF EXCAVATION

Section 02370 —- EROSION CONTROL

Section 02518, TRACER TAPE

Section 02745, ROAD RESTORATION

REFERENCES:
American Society for Testing and Materials (ASTM)

ASTM _Cl131 Test Method for Resistance to Degradation of Small Size
Coarse Aggregate by Abrasion and Impact in the Los Angeles
Machine.

ASTM C136 Method for Sieve Analysis of Fine and Coarse Aggregates.
ASTM ~— C330 Specification for Lightweight Aggregate
for Structural Concrete.

ASTM D1556_ Test Method for Density of Soil in Place by the Sand Cone
Method.

ASTM = D1557 Test Methods for Moisture-density Relations of Soils and
Soil
Aggregate Mixtures Using Ten-pound (10 Lb.) Hammer and
Eighteen-inch (18") Drop.

2022 Sewer Replacement Project Earthwork
Nashua, NH 02300-1

Page Image
Board Of Aldermen - Agenda - 4/12/2022 - P221

Footer menu

  • Contact