Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/6/2018 - P175

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P175

THE CITY OF NASHUA “The Cate City’

Financtal Services

Purchasing Department

ASIST LTE oe RAR ROBISON REN

May 31, 2018
Memo #18-161

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: PAVEMENT MANAGEMENT SERVICES FOR 2018 PAVING PROGRAM (VALUE:
$328,675)
DEPARTMENT: 160 ADMIN/ENGINEERING; FUND: BOND

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated May 31, 2018
for information related to this purchase.

Finance Committee - Agenda - 6/6/2018 - P174

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P174

EXHIBIT D

Finance Committee - Agenda - 6/6/2018 - P173

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P173

SECTION 413
Method of Measurement
4.1 Hot-poured crack sealant will be measured by the pound of material incorporated in the work.

Basis of Payment
5.1 The accepted quantity of hot-poured crack sealant will be paid for at the contract unit price per pound, complete in place.

5.2 Cleaning and routing will be subsidiary.

Pay item and unit:

413.1 Hot-Poured Crack Sealant Pound
413.2 Hot-Poured Crack Sealant (Low Modulus) Pound
2016 NHDOY
Go To= TOC Division 100 Division 20¢ Division 300 Division 400 Standard

Finance Committee - Agenda - 6/6/2018 - P172

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P172

SECTION 413

SECTION 413 -- HOT-POURED CRACK SEALANT

Description
1.1 This work shall consist of filling the major cracks in the pavement with an approved sealant material. The cracks to be filled

will be those designated by the Engineer.

Materials & Equipment
2.1 Material shal! be of the hot-poured type and be a product as included on the Qualified Products List.

2.1.1 Material not covered by an asphalt pavement overlay shall meet the requirements of ASTM D6690 Type II.

Finance Committee - Agenda - 6/6/2018 - P171

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P171

SECTION 410

3.6 Finished Appearance.

3.6.1 Any bituminous material splashed or sprayed onto exposed surfaces of curbs, sidewalks, or other masonry structures shall
be removed by sandblasting at the Contractor's expense.

Method of Measurement
4.1 Bituminous surface treatment will be measured by the ton, in accordance with 109.01, to the nearest 0.1 ton.

4.1.1 Blotter material furnished will be subsidiary.
4.2 Asphalt emulsion for tack coat will be measured by the gallon, in accordance with 109.01 , to the nearest gallon.

Finance Committee - Agenda - 6/6/2018 - P170

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P170

SECTION 411

3.4 Placing shall conform to 401.3.10 with the following modifications:

3.4.1 The existing pavement shall be thoroughly dry and free from all dust, dirt, and loose material. Sweeping with a power
broom supplemented by hand brooming may be required.

3.4.2 Existing pavement shall be treated with tack coat as prescribed in 410.3.4. When ordered, the existing pavement shall
be treated as prescribed in 410.3.3.

3.4.3 A leveling course of hot bituminous concrete may be ordered to prepare the pavement for the finish course.

Finance Committee - Agenda - 6/6/2018 - P169

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P169

SECTION 411

SECTION 411 -- PLANT MIX SURFACE TREATMENT
Description
L.1 This work shall consist of a leveling course when ordered and one or more courses of bituminous mixture constructed on an

existing pavement.

1.2 This work when specified shall consist of a dual purpose single course bituminous mixture which acts as a shim course and
a wearing course constructed on an existing pavement.

Materials
2,1 Materials and their use shall conform to the requirements of 401.2 as amended below:

Finance Committee - Agenda - 6/6/2018 - P168

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P168

SECTION 410

The edges of existing pavements that are to be adjacent to new pavement shall be cleaned to permit the adhesion of bituminous
materials.

3.4 Application of Bituminous Material.

3.4.1 Tack coat. Bituminous material shall be uniformly applied with an approved applicator. When ordered, a pressure
distributor shall be used. The tack coat shall be applied in such a manner as to offer the least inconvenience to traffic and to permit
one-way traffic without pickup or tracking of the bituminous material.

Finance Committee - Agenda - 6/6/2018 - P167

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P167

SECTION 410
SECTION 410 -- BITUMINOUS SURFACE TREATMENT

Description
Materials

Construction Requirements
3.2 Equipment.
3.3 Preparation of Surface to be Treated.
3.4 Application of Bituminous Material.
3.5 Seal Coat.
3.6 Finished Appearance.

Method of Measurement

Basis of Payment
Description

Finance Committee - Agenda - 6/6/2018 - P166

By dnadmin on Mon, 11/07/2022 - 11:37
  • Read more about Finance Committee - Agenda - 6/6/2018 - P166

SECTION 403

Pay items and units:

403.11 Hot Bituminous Pavement, Machine Method Ton
| 403.119 Hot Bituminous Pavement, Machine Method, High Strength Ton |

403.12 Hot Bituminous Pavement, Hand Method Ton
403.351 Hot Bituminous Pavement, Aggregate 35 percent Wear, Ton

Machine Method
403.352 Hot Bituminous Pavement, Aggregate 35 percent Wear, Hand = Ton

Pagination

  • Previous page ‹‹
  • Page 983
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact