Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/20/2019 - P225

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P225

ewe 2, & — ae
~ cit oN a OS ES Sa
fete, emt ee, an ta oe Hees S32 2s
get Or ee one ee del BESS 2a = 5a
eed FRR ee aS 22a = ' : =
raft : ——s SS = —

THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON BLUE BACKGROUND.

B wafRoitlorney limits the acts of those named herein, and theysfiayef oan if7t6.bind the Company-exGepf in the = S
aniiez.aiid £6 tHesextent herein stated. Not valid for Nate, Loan, Leffer éecredifeCurrentyiRate, interest Rate.or Résidentlalcx “ies
EAE ee Rato.or Residential

Finance Committee - Agenda - 3/20/2019 - P224

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P224

”

BID BOND |

Conforms with The American Institute of
Architects, A.I.A. Document No, A-310

KNOW ALL BY THESE PRESENTS, That we, Charter Contracting Company LLC

500 Harrison Avenue, Suite 4R, Boston, MA 02118-2439

as Principal, hereinafter called the Principal,

andthe Arch Insurance Company

«

of 3 Parkway, Ste. 1500, Philadelphia, PA 19102 , a corporation duly organized under
the laws of the State of Missouri , as Surety, hereinafter called the Surety, are held and firmly bound unto

Finance Committee - Agenda - 3/20/2019 - P223

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P223

Schedule of Values - Alternate Bid Items
Phase II] Construction - Stage I

Four Hills Landfill
Nashua, New Hampshire Charter Contracting Company, LLC
(Revised February 2019) January 20, 2019 | Page 3 of 3
Alt. Bid Construction Items Estimated Quantity|| Bid Unit Prices Extended
Item No. m (w/units) ($/units) Prices ($)
A7___ {Leak Detection Survey is | $25,000.00 ST [$25,000.00]
A24 __|Screening Vegetation | $30,000.00 - 000.00
| A27_ [Portable Litter Fence $19,000.00 | $76,000.00}
— Big Price | ETE

Finance Committee - Agenda - 3/20/2019 - P222

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P222

Schedule of Values - Bid Items
Phase III Construction - Stage !

Four Hills Landfill
Nashua, New Hampshire Charter Contracting Company, LLC
(Revised February 2019) January 20, 2019 | Page 2 of 3

Estimated
Construction Items Quantity
w/units
Tem Diversion Swale 670 LF LF
Drain Manhole LS LS

Bid Unit Prices Extended
($/units) Prices ($)

Finance Committee - Agenda - 3/20/2019 - P221

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P221

Schedule of Values - Bid Items
Phase III Construction - Stage I

Four Hills Landfill
Nashua, New Hampshire Charter Contracting Company, LLC
(Revised February 2019) January 20, 2019 | Page 1 of 3

Estimated
Construction Items Quantity
w/units
obilization bilization 1 LS .00 | LS

Bid Unit Prices Extended
($/units) Prices ($)

Finance Committee - Agenda - 3/20/2019 - P220

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P220

January 10, 2019 Page 14
20190110 Bid Item Defintions.docx 3066.09

ALTERNATE BID ITEM DEFINITIONS
Alternate Bid Item No. A7 Leak Detection Survey

Finance Committee - Agenda - 3/20/2019 - P219

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P219

January 10, 2019 Page 13
20190110 Bid Item Defintions.docx 3066.09

a. Install Existing Litter Control Fence includes installing litter control fence removed as part
of Bid Item 2 in accordance with the Drawings and manufacturer specifications.
Repairing damaged netting at the discretion of the OWNER is incidental to this Bid Item.

Payment for this Bid Item will be made on a linear foot basis for existing litter control fence
installed.

Finance Committee - Agenda - 3/20/2019 - P218

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P218

January 10, 2019 Page 12
20190110 Bid Item Defintions.docx 3066.09

shown on the Drawings is to be included in the Work associated with the installation of the
respective culvert.

Payment for installation of culverts will be on a lump sum basis for a complete installation
of each culvert identified.

Bid Item No. 24 Topsoil and Seeding

Finance Committee - Agenda - 3/20/2019 - P217

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P217

January 10, 2019 Page 11
20190110 Bid Item Defintions.docx 3066.09

and as specified. The Work includes shaping the swale section and installing the
geomembrane as indicated on the Drawings.

Payment for this Bid Item will be on a lineal foot basis for the geomembrane-lined swale
constructed.

Bid Item No. 20 Smartditch-Lined Downchute

Finance Committee - Agenda - 3/20/2019 - P216

By dnadmin on Mon, 11/07/2022 - 13:08
  • Read more about Finance Committee - Agenda - 3/20/2019 - P216

January 10, 2019 Page 10
20190110 Bid Item Defintions.docx 3066.09

c. Low-Permeability Soil includes furnishing, placing, and compacted a 12-inch thick lift of
Screened Till within Pond 6 and the Forebay as shown on the Drawings.

Payment for this Bid Item will be made per cubic yard of material placed based on pre-
and post-stockpiling surveys performed by CONTRACTOR and approved by OWNER.
OWNER may perform its own surveys to evaluate the quantity for payment.