January 10, 2019 Page 13
20190110 Bid Item Defintions.docx 3066.09
a. Install Existing Litter Control Fence includes installing litter control fence removed as part
of Bid Item 2 in accordance with the Drawings and manufacturer specifications.
Repairing damaged netting at the discretion of the OWNER is incidental to this Bid Item.
Payment for this Bid Item will be made on a linear foot basis for existing litter control fence
installed.
b. Install New Litter Control Fence includes furnishing and installing new litter control fence
where indicated on the Drawings and in accordance with manufacturer specifications.
Litter control fence shall match the existing litter control fence on site or be an equivalent
approved by the OWNER.
Payment for this Bid Item will be made on a linear foot basis for litter control fence furnished
and installed.
Bid Item No. 28 Guardrail
This Bid Item includes all labor, materials, equipment, tools, and apparatus needed to furnish
and install guardrail as indicated on the Drawings. Guardrail shall conform to NHDOT
requirements. The Work includes all end sections and connections.
Payment for this Bid Item will be made on a linear foot basis for guardrail constructed.
Bid Item No. 29 As-Built Drawings
This Bid Item includes all labor, materials, equipment, tools, and apparatus needed to
prepare the As-Built Drawings as required by the Specifications. The Work includes the
redline mark-ups of the construction Drawings modified as Work progresses. As-Built
Drawings shall bear the stamp of a professional engineer or land surveyor licensed in New
Hampshire and be drafted using computer aided drafting (CAD) software and be provided to
ENGINEER in hard copy and electronic format. The electronic files should include all survey
points used to generate the drawings. The As-Built Drawings are to be provided within 30
days of issuance of a “Certificate of Substantial Completion.”
Payment for this Bid Item will be on a lump sum basis following final receipt of the As-Built
Drawings.
Bid Item No. 30 Payment Bond
This Bid Item includes furnishing a payment bond for the project and will be paid on a lump
sum basis.
Bid Item No. 31 Performance Bond
This Bid Item includes furnishing a performance bond for the project and will be paid on a
lump sum basis.