Finance Committee - Agenda - 3/6/2019 - P344
Technical Specitications FY2019 Paving Program
ITEM 203.112 -ROAD EXCAVATION AND REGRADE
A. SCOPE
This work includes repair to subgrade and regrading and replacing removed subgrade material
with pavement at specific locations as directed by the Engineer.
This item will only be used at locations identified by the Engineer. In other areas where
subgrade is exposed during milling, grading and compaction of disturbed subgrade will be
incidental to subsequent paving.
B. MATERIALS AND CONSTRUCTION