Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/6/2019 - P654

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P654

foeh) THE CITY OF NASHUA

Pinaud Seretées
Purchasing Departetent

“The Gate City”

February 12, 2019

IFB0779-021419
2019 SEWER REPLACEMENT PROJECT

ADDENDUM NO.1

Information included in this document becomes a part of the original IFB.

If you are submitting a paper bid, please sign below to indicate receipt of this additional information and include this
page with your bid submittal. If you are submitting a bid via Bid Express please be sure to acknowledge the addendum
on the website before submitting your bid.

Finance Committee - Agenda - 3/6/2019 - P653

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P653

DIVISION 1

INVITATION TO BID

Finance Committee - Agenda - 3/6/2019 - P652

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P652

TABLE OF CONTENTS

Finance Committee - Agenda - 3/6/2019 - P651

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P651

2019 Sewer Replacement Project

Construction Specifications
and
Contract Documents

Prepared By:

Hayner/Swanson, Inc.
3 Congress Street
Nashua, NH 03062
Tel: (603) 883-2057

Prepared For:

City of Nashua, New Hampshire
Division of Public Works
Engineering Department

January 2019

Finance Committee - Agenda - 3/6/2019 - P650

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P650

To:

From:

Re:

G. Motion:

Discussion:

City of Nashua, Public Works Division

Board of Public Works Meeting Date: February 28, 2019

Stephen Dookran, P.E., City Engineer
Engineering Department

2019 Sewer Replacement
Construction

To approve the award of the construction contract for the 2019 Sewer Rehabilitation
Project to N. Granese & Sons, Inc. of Salem, MA in the amount of $1,001,888. Funding
will be through: Department: 169 Wastewater; Fund: Bond; Activity: Sewer Rehab.

Finance Committee - Agenda - 3/6/2019 - P649

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P649

)) THE CITY OF NASHUA “The Gate City’

Financial Services

Purchasing Department

February 28, 2019
Memo #19-126

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: 2019 SEWER REPLACEMENT CONSTRUCTION (VALUE: $1,001 ,888)
DEPARTMENT: 169 WASTEWATER; FUND: BOND

Please see the attached communication from Stephen Dookran, P.E., City Engineer, dated February 28,
2019 for information related to this purchase.

Finance Committee - Agenda - 3/6/2019 - P648

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P648

E. Inside drop bowl assemblies; and reconstructed channels, inverts, and benches shall pass
a visual inspection for voids, pinholes, cracks, leakage, and any other defect.

END OF SECTION

2019 CIPP Lining Project Manhole Rehabilitation
Nashua, NH 02800-10

Finance Committee - Agenda - 3/6/2019 - P647

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P647

3.05

Schedule 40 PVC pipe shall be connected using industry-grade solvent cement.

Drop pipe shall be secured to the inside of manhole using steel straps or struts. Straps
shall have a minimum width of 1/2 inch and a minimum thickness of 0.03 inch.

Finance Committee - Agenda - 3/6/2019 - P646

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P646

3.03

3.04

and date of work performed shall be affixed to the structure in a readily-visible location,
and a final written report shall be provided to Owner and Engineer detailing the location,
date of report, and description of liner installation.

Finance Committee - Agenda - 3/6/2019 - P645

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P645

4. Finished Dry Thickness: See Article 3.04, Paragraph H herein

5. Bond Strength: 2,000 psi (per ASTM C882)

PART 3 - EXECUTION
3.01 GENERAL:

A. Contractor shall accurately field-measure and size the rehabilitation products for each
individual manhole. Each existing sewer manhole to be rehabilitated may have a
different configuration and varying field dimensions. All field measurements shall
conform to the requirements of the manufacturers of the rehabilitation products.

3.02 INTERNAL LINER SYSTEM:

Pagination

  • Previous page ‹‹
  • Page 607
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact