Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 3/6/2019 - P664

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P664

230G-S¢4

IVLOLANS $ TOVd
00°000‘0z$ 00°000‘0z$ sjelioyey] Snopsezey payedionueur) Joy souemoy] Vy soUeMOTY 87
ojely Jo soureusjureypy| = ST I LZ
dg [2j0], Dig Wun TOHdaDsaq W9j] sjiuy) | AWueng | “ON
Wd}]

(Tl# WOAGNAaCY) }efo1g pUoMadETdayY 19Mag 6107 - AINGAHOS Id

Finance Committee - Agenda - 3/6/2019 - P663

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P663

24j0%-S4

TVLOLANS ¢ ADVd

sios3e[q| WH CIL 9¢

00°000‘S$ 00°000‘S$ SIOOJO S'[Od pouojiuy| — soueMoT[V SZ

uoneziiqol| ST I v7

yoes Ws] Va IZ ET

durey Gnd yemepis Je joued Suu sqQuIONI0q) WA 8 7

aseg [OABID poysni Suipnjouy sweday ypemapls ajasou07 9] AS OZE 1Z

aseg [SARIN poysnsy Surpnpouy edoy yemoprs snourumnyrg 7] AS 0€ 0z

QYsteNsS) qind suBIH [eoIaA MON] AT 76 6I
dod [20], dog Hal} WoKdiasaq wl9}] swap) | gaend | “on
wH93]

(I# WAGNAACY) 392fo1g pusuIsd"[day 19M9g 6107 - AINGAHOS Ad

Finance Committee - Agenda - 3/6/2019 - P662

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P662

Z2s9€-S¢a

Finance Committee - Agenda - 3/6/2019 - P661

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P661

249¢-S4

TVLOLANS 7 HOVd
ulseg Yyoyes sovjdoy pue saoulay] =A 601 Ol
(uONeAROXY YOUSIL JOYIO UI Jou JI AUC) Jeloye'] uleiq pouopueqy saowlsy| JT 907 6
9[OH] SUNSIXY YIM sOYURJ] OMA SUTISIXY 0} JaMag MAN JOoUUOD] WA S 8
uolonysuOSSY LaAuy sjoyueyy| Wa ¢ L
gjoyuey] James SUNSIXY SAOWIOY] Wa Z 9
a]oyURP] JOMIS SUISIX” s0e[doy JO MON| AA ~9 S
OAM OAd u2l X.9| WA SZ dv
OAM Ad uZ1 X01] Wa S Vr
(AA 9 9} Z) AouUNYD DAd 9] WA 01 €
dd [OL dog Mul) Wo diaseq Ws] swag, | Auend | *on
1193]

Finance Committee - Agenda - 3/6/2019 - P660

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P660

2£j01-S4a

TVLOLGS I aDVd

Finance Committee - Agenda - 3/6/2019 - P659

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P659

9. REVISED BID SCHEDULE:

A revised BID SCHEDULE has been included in this Addendum for use by bidders
(See attached PDF).

10. REVISED SHEET 2 of 8 - QUANTITY SUMMARY:

A revised Sheet 2 of 8 - Quantity Summary has been included in this Addendum for
use by bidders (See attached PDF).

- END -

2019 Sewer Replacement Project Addendum #1
Nashua, NH Page 5

Finance Committee - Agenda - 3/6/2019 - P658

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P658

> Methods proposed for maintaining flow in sewer mains and
service connections shall be described in detail, and shall
have been proven by successful use in similar past projects.

> The trench shall be plated after work hours, and the work
area shall be open to traffic.

7. Add the following Item to the SUPPLEMENTARY CONDITIONS:

W. AVOIDING PIPE AND CATCH BASIN CONFLICTS WITH
EXISTING UTILITIES

Finance Committee - Agenda - 3/6/2019 - P657

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P657

Payment:

The approved quantity of flagger hours shall be paid at the
contract price for ITEM 26. Payment shall constitute full
compensation to the Contractor for providing qualified
flaggers as required to direct traffic through or around the
Work as ordered by the Engineer, including all labor, high
visibility safety gear, tools and any other equipment necessary
to complete the work as specified herein. Payments to
Contractor will be made based on approved hours and
resulting dollar amounts.

Finance Committee - Agenda - 3/6/2019 - P656

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P656

2.03 PROJECT START-UP AND PROJECT CLOSE OUT:

A. MOBILIZATION
Measurement:
Mobilization shall be measured as a LUMP SUM as specified
herein. The total cost for this item shall not exceed 5 percent
of the total of all bid items excluding this item.

Payment:
The contract price for ITEM 24 shall constitute full

Finance Committee - Agenda - 3/6/2019 - P655

By dnadmin on Mon, 11/07/2022 - 13:12
  • Read more about Finance Committee - Agenda - 3/6/2019 - P655

IFB0779-021419
ADDENDUM #1

2019 Sewer Replacement Project

Addendum #1 is being issued to respond to questions received from bidders:
1. Will Davis-Bacon or prevailing wages be in effect for this project?
Answer: Davis-Bacon Act prevailing wage rates do not apply to this project..

2. There is a conflict between the retainage as stated in the Instructions to Bidders,
Article 20 and the Sample Agreement.

Answer: Instructions for Bidders, Article 20, Retainage shall be deleted in its
entirety and replaced as follows:

Pagination

  • Previous page ‹‹
  • Page 606
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact