Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 8/4/2021 - P52

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P52

City of Nashua

Purchasing Department
Administrative Services Division (603) 589-3330
229 Main Street - Nashua, NH 03060 Fax (603) 594-3233

July 28, 2021
Memo #22-154

TO: Mayor Donchess
Finance Committee

SUBJECT: Construction Engineering for Phase 2 of the Pump Station Upgrade Project in the amount
not to exceed $427,600 funded from accounts 81700 Infrastructure Improvements

Finance Committee - Agenda - 8/4/2021 - P51

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P51

®
ACORD
(—

CERTIFICATE OF LIABILITY INSURANCE

DATE (MM/DD/YYYY)
05/03/2021

THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED

REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.

Finance Committee - Agenda - 8/4/2021 - P50

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P50

Flow Meter Installation 4 Meters $1,000.00 $4,000.00

2 | Flow Meter Operation, Maintenance, & Rental | 88 Meter | $450.00 | $39,600.00
(4 Meters x 22 Months= 88 Meter Months) Months

3 Flow Data Reduction & Presentation 88 Data $200.00 $17,600.00
(4 Meters x 22 Months= 88 Data Months) Months

_ Total: $61,200.00

VU. METHOD OF PAYMENT

Finance Committee - Agenda - 8/4/2021 - P49

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P49

D. Make arrangements to provide access to and exposure for entry those manholes within the
study area which are buried, covered or otherwise not readily accessible.

E. Provide free and legal access to all sites of work.

F. Assure the prompt clearance of major blockages or obstructions in the sewer system, if any,
should such clearance be required for performance of the work.

G. Provide the shutdown of certain pump stations, upon prior request, should it become
necessary for the satisfactory performance of the work.

Finance Committee - Agenda - 8/4/2021 - P48

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P48

FLOW METER SELECTION/INSTALLATION

Once a site has been identified the appropriate meter with any specific sensors will be installed.
The installation will consist of installing tight fitting aluminum bands with both flow depth and
velocity sensors mounted in such a way as not to obstruct flow or snag paper or other disposed
items m the flow stream.

INITIAL & SUBSEQUENT FLOW VERIFICATION

Finance Committee - Agenda - 8/4/2021 - P47

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P47

for rainfall related inflow during wet weather periods. Continuous metering will be
conducted for the designated time period as directed by the Client.

The flow monitoring will be accomplished by one of the following methods:

1. The use of continuous monitoring devices incorporating a velocity sensor combined with
a depth sensor, or

2. Palmer Bowlus flumes, in conjunction with continuous depth recording.

Finance Committee - Agenda - 8/4/2021 - P46

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P46

IE

ASSESSMENT SERVICES

PROPOSAL FOR SEWER SYSTEM FLOW MONITORING
CITY OF: NASHUA, NH
DATE: JULY 12, 2021

NashuaWWtTF

2 Sawmill Rd.
Nashua, NH 03060
Attn: Dave Boucher

PURPOSE

The City of Nashua, NH, (herein called “Client) has requested from Flow Assessment Services,
LLC, (herein called “Subconsultant”) a proposal for specialized services in the City of Nashua.
This document represents Subconsultant’s proposal to perform the requested services and
includes the following:

Finance Committee - Agenda - 8/4/2021 - P45

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P45

30.

31.

unenforceable provisions were omitted, and the parties may renegotiate the invalid or
unenforceable provisions for sole purpose of rectifying the invalidity or unenforceability.

Finance Committee - Agenda - 8/4/2021 - P44

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P44

27.

28.

29.

Finance Committee - Agenda - 8/4/2021 - P43

By dnadmin on Mon, 11/07/2022 - 13:38
  • Read more about Finance Committee - Agenda - 8/4/2021 - P43

22.

Pagination

  • Previous page ‹‹
  • Page 292
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact