Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Board Of Aldermen - Agenda - 9/28/2020 - P86

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P86

UREAN

Ffollis and Main
Street: The region’
100% Corner

DESIGN ASSOCIATES

this intersection. A series of distinct, 4-
to 6-story, mixed-use buildings wold cre-
ate a center to the Downtown. They
buildings would anchor both ends of
Main Street by creating a strong center.
and transform an anonymous intersec-

tion into the region’s symbolic heart.

Board Of Aldermen - Agenda - 9/28/2020 - P85

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P85

DESIGN ASSOCIATES

Board Of Aldermen - Agenda - 9/28/2020 - P84

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P84

URBAN DESIGN ASSOCIATES

Benches

Several benches along
Main Street are poorly
located. Benches that
face traffic or are located
in the middle of
sidewalks are rarely
used, Where possible,
benches should either be
paired, facing each
other, or they should be
located with their backs
to storefronts.

Diagrams
Inappropriate bench
location (below left}

Appropriate bench
location (below right}

Board Of Aldermen - Agenda - 9/28/2020 - P83

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P83

UREAN

DESIGN ASSOCIATES

Streetscaping

Maintenance and upgrades to the
streetscape of Main Street is critical.
Begun in the early 1980's, the streetscape
program has been a great success. The
comfortably wide sidewalks, warm red
bricks, and the canopy of street trees cre-
ate a pedestrian environment that has
been instrumental in Main Street’s resur-

gence over the past 15 years. However,

Nashua Downtown Master Plan

some sidewalk bricks have been dis-

Board Of Aldermen - Agenda - 9/28/2020 - P82

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P82

UR EAN DESIGN assocrates Nashua Downtown Master Plan

v. Main Street North

MAIN STREET NORTH 18 healthy. Also referred to as “walking 52
Main Street”, there are almost no retail vacancies, sidewalks are
active, and there is a vibrant mix of retail, offices and restau-

rants. Behind Main Street on both sides, however, significant
attention is required. The seam between the neighborhoods

and Main Street North is ragged. Spring Street and Elm Street

are characterized by disinvestment, surface parking lots, and

Board Of Aldermen - Agenda - 9/28/2020 - P81

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P81

DESIGN ASSOCIATES

Development Opportunities
Most of the buildings on Railroad
Square are worthy of preservation. While
several buildings may be renovated, one
site is identified for new construction. It
is important that new construction as
well as renovation adhere to strict archi-
tectural design guidelines, based on
Nashua’s historic architectural traditions.

The most important renovation proj-
ect will be the Laton Hotel. Specifically,
the striking double-level porch should be
restored

Board Of Aldermen - Agenda - 9/28/2020 - P80

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P80

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Iv Railroad Square

RAILROAD SQUARE 18 AN urban design landmark located at the 50
confluence of four regional arterials. With four high-volume
arterials converging into a small area bound on one side by

water, Railroad Square performs admirably, as it delicately bal-
ances the heavy impacts of regional through-traffic on all four
arterials with an environment that is surprisingly pedestrian-
friendly. The challenge of Railroad Square will be to establish

Board Of Aldermen - Agenda - 9/28/2020 - P79

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P79

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Existing rail right of 49
way behind Cattleman’s

(top)

Proposed rail right of
way, redevelopment
and trail connection.
(bottom)

Board Of Aldermen - Agenda - 9/28/2020 - P78

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P78

DESIGN ASSOCIATES

A new parking garage may have to be
built to support this facility. A site along
Spring Street, just south of Temple
Street, is recommended. The BAE Sys-
tems parking lot, located on the north
side of the river should be considered a
parking resource for the Performing Arts
Center. If the dam structure is modified
to contain a pedestrian walk, the BAE
Parking lot will be less than a five minute

walk from the Performing Art Center.

Nashua Downtown Master Plan

Temple Street Neighborhood

Board Of Aldermen - Agenda - 9/28/2020 - P77

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P77

DESIGN ASSOCIATES

park system and regional trail system
should be developed at this location.

Pagination

  • Previous page ‹‹
  • Page 2528
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact