DESIGN ASSOCIATES
A new parking garage may have to be
built to support this facility. A site along
Spring Street, just south of Temple
Street, is recommended. The BAE Sys-
tems parking lot, located on the north
side of the river should be considered a
parking resource for the Performing Arts
Center. If the dam structure is modified
to contain a pedestrian walk, the BAE
Parking lot will be less than a five minute
walk from the Performing Art Center.
Nashua Downtown Master Plan
Temple Street Neighborhood
The Temple Street neighborhood should
be extended to include new housing along
an extended Park Street. The new housing
would overlook the Riverfront East trail
and park. As Park Street is extended along
the river to Temple Street, a site for a new
100-unit senior/elderly building is pro-
posed. Creating a new riverfront drive will
a great new address and will be an impor-
tant component to improving visibility and
visitability to the park.
48
Iilustrative plan of
Riverfront East
(tep}
Existing section of
south bank of Nashua
River
{middle}
Proposed section of
south bank of Nashua
River
(bottom)
