Board Of Aldermen - Agenda - 9/9/2020 - P229
\Wwhb\prof\Bedion$2700.00 Nashua
Cireulation Stud\\reparts\Final ReportiFinal
Report dock
@ Vanasse Hangen Brusilin, Inc.
2
\Wwhb\prof\Bedion$2700.00 Nashua
Cireulation Stud\\reparts\Final ReportiFinal
Report dock
@ Vanasse Hangen Brusilin, Inc.
2
@ Vanasse Hangen Brustlin, Inc.
Executive Summary
Introduction
@ Vanasse Hangen Brustlin, Inc.
List of Figures
\Wwhbipray\Badior\2700,00 Nashua
Circulation Studyvreports\Final Report Final
@ Vanasse Hangen Brustlin, Inc.
Table of Contents
rary
Executive Summary auasapoanaaad neaaenaeaasnsaTinnaTeveainaried
@ Vanasse Hangen Brustlin, Inc.
Downtown Circulation Study
Nashua, New Hampshire
Prepared for
The City of Nashua, NH
Prepared by
Vanasse Hangen Brustlin, Inc.
Bedford, New Hampshire
January, 2015
\iwhitiproy\BedloriS2700.00 Nashua
Circulation Studyireports\Final RepartiFinal
Repart.deck
Final Report
Downtown Circulation Study
Nashua, New Hampshire
Prepared for City of Nashua, New Hampshire
Prepared by VHB/ Vanasse Hangen Brustlin, Inc.
Bedford, New Hampshire
January, 2015
Appendix C
2015 Downtown Circulation Study
UREAN
DESIGN ASSOCIATES
Nashua Downtown Master Plan
Key
C1 New Streets
[Bi Improved Streets
1 Parks and Trails
1 Parking Structures
Public Infrastruc- 96
ture
The Master Plan
recommends public
action be taken to crate
infrastructure that will
leverage substantial
private investment.
Infrastructure
Quantities
URBAN DESIGN
Broad Street Park-
way
lief}
Oumership
fright}
Tlustrative Plan
Nashua Center For
Heritage and
Future Technology
(left)
Oumership
(right)
Mlustrative Plan
ASSOCIATES
Nashua Downtown Master Plan
Key
Private Ownership
Public Ownership
Institutional Ownership
95
UR EAN DESIGN assocrates Nashua Downtown Master Plan
Riverfront East
Park and
Performing Arts
Center
ftep}
Oumership
(bottom)
Tlustrative Plan
O O Private Ownership
Public Ownership
Oo Institutional Ownership