Nashua Downtown Master Plan
Key
C1 New Streets
[Bi Improved Streets
1 Parks and Trails
1 Parking Structures
Public Infrastruc- 96
ture
The Master Plan
recommends public
action be taken to crate
infrastructure that will
leverage substantial
private investment.
Infrastructure
Quantities
The table below is to be
used to generate
preliminary estimates of
costs, Locally
appropriate per unit
costs can be applied to
the values in the table.
Riverfront Riverfront Railroad Main Street Main Street Total
West East Square North South
New Streets 10,650 If 3,150 If 0 6501 250 If 14,700 If
Improved Streets 6,350 If 0 700 If 2,200 If 4700 If 13,950 If
Parks 8.2 acres 7.5 actes 0 .7 acres 6.4 acres 22.8 acres
Parking Structures 520 spaces 0 0 640 spaces 300 spaces 1,460 spaces
Trails outside 9,600 If 250 If 0 3,300 If 0 13,1501
Parks