Finance Committee - Agenda - 5/17/2017 - P290

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P290

2. Elongation (%) 15% ASTM D-4632

3. Puncture Strength (Ibs.) 65 ASTM D-4833
4. Burst Strength (psi) 300 ASTM D-3786
5. Trapezoid Teer (Ibs.) 60 ASTM D-4533
6. Equivaent Opening Size(U.S. Sieve) No. 30 ASTMD-45/1

7. Permittivity (sec) 0.10 ASTMD-4491

8. Weter Flow Rete (gd/mir/s¥.) 10 ASTM D-4491
9. UV Resistance (%) 70 ASTM D-4355

The silt fence shall be Mirafi Envirofence manufactured by Mirafi, Inc. or aoproved equa.

END OF SECTION

01570-6

Finance Committee - Agenda - 5/17/2017 - P289

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P289

C.

The pumped water shall be filtered through bded straw, a vegelative filte drip or a
vegetated channd to trao sediment occurring as a result of the construction operations. The
vegetated channel shal be constructed such that the discharge flow rate shall not exceed a
velocity of more than 1 foot per second. Accumulated sediment shall be cleered from the
channel periodically.

12. Dust Control

A.

Finance Committee - Agenda - 5/17/2017 - P288

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P288

The Contractor shall not deface injure or destroy trees or sorubs nor remove or cut then without
written authority from the Owner. No ropes, cables, or guys shdl be fastened to or attached to any
existing nearby trees for anchorages unless specifically authorized by the Engineer. Excavating
machinery and cranes sndl be of suitable type and be operated with care to prevent injury to
trees which ave not to be removed, paticulaly ovethenging branches ard limbs. The
Contractor shall, in any event, beregoonsiblefor any damage resulting from such use.

Finance Committee - Agenda - 5/17/2017 - P287

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P287

7.

8.

9.

designated as wetlands. Temporary storage areas for excavated materia shall be as directed
by the Engineer.

Finance Committee - Agenda - 5/17/2017 - P286

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P286

3. Implementation

A.

Prior to commencement of work, the Contractor shall meet with representatives of the
Engineer to devdoo mutud understandings rddive to compliance of the environmenta
protection program.

The Contractor shdl submit for aoprova six sets of deals and literature fully describing
environmenta protection methods to be enployed in carrying out construction activities within
100 feet of wetlands or across areas desi gnated as wetlands.

4. Areaof Construction Activity

Finance Committee - Agenda - 5/17/2017 - P285

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P285

SECTION 01570

ENVIRONMENTAL PROTECTION

Description

Notification

Implementation

Areaof Construction Activity

Protection of Water Resources
Construction in Areas Designated as Wetlands on the Drawings
Protecting and Minimizing Exposed Areas
Location of Storage Areas

Protection of Landscape

10. Cleering and Grubbing

11. Dischargeof Dewatering Operations

12. Dust Control

13. Seperation and Replacement of Topsoil

14. Bded Straw

15. Silt Fence

1. Description

Finance Committee - Agenda - 5/17/2017 - P284

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P284

SECTION 01550

TRAFFIC CONTROL AND SIGNAGE

PART 1 - GENERAL

1.01

1.02

WORK INCLUDED:
This Section covers furnishing and installing traffic control signs and other devices.
SYSTEM DESCRIPTION:
The Contractor shall furnish and install all construction signs deemed necessary by and in

accordance with the latest edition of Part VI of the Manual on Uniform Traffic Control
Deyices (MUTCD) as published by the U.S. Department of Transportation.

PART 2 - PRODUCTS

2.01

TRAFFIC WARNING AND REGULATING DEVICES:

Finance Committee - Agenda - 5/17/2017 - P283

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P283

All television inspection shall be recorded on VMS format system that utilitizes ¥2-inch
recording videotapes and the SLR mode. The Contractor shall provide two (2) original and
labeled copies of each videotape to the Owner, at no additional cost, at the end of the
project. All VCR videotapes shall have a typed label listing tape number, date work
was performed, “City of Nashua’, contract number and sub area designation. Each tape
shall be referenced in a logbook that details upstream and downstream sub area and

Finance Committee - Agenda - 5/17/2017 - P282

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P282

SECTION 01331

DOCUMENTATION
PART 1 - GENERAL
1.01 WORK INCLUDED:
A. This section covers the requirements for documentation to be furnished by the

Contractor on this project.

1.02 RELATED WORK:

A. Section 02441, CLEANING, TELEVISION INSPECTION, & TESTING OF NEW
PIPELINES

1.03 DOCUMENTATION:

Finance Committee - Agenda - 5/17/2017 - P281

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P281

techniques of construction; coordinating his work with that of all other trades; and
performing his work in a safe and satisfactory manner. The review of the shop drawings is
general and shall not relieve the Contractor of the responsibility for details of design,
dimensions, code compliance, etc., necessary for interfacing with other components, proper
fitting and construction of the work required by the Contract and for achieving the specified
performance.