Finance Committee - Agenda - 5/17/2017 - P370

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P370

B.

Concrete for encasement shall be as specified in Section 03302 FIELD CONCRETE.

PART 3 - EXECUTION

3.01

A.

INSTALLATION:

BUILDING CONNECTIONS:

1.

Building connections shall be installed using the same construction and pipe joining
techniques as specified in Section 02085 POLYVINYL CHLORIDE GRAVITY PIPE
AND FITTINGS.

Finance Committee - Agenda - 5/17/2017 - P369

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P369

SECTION 02530
BUILDING CONNECTIONS AND DROP CONNECTIONS
PART 1 - GENERAL
1.01 ©WORK INCLUDED:

A. This Section covers furnishing of all materials and labor to construct building sewer
connections and drop connections as indicated on the Drawings, and as herein specified.

B. _ Final location of building connections shall be determined in the field by the Engineer.

1.02 RELATED WORK:

A. Section 02300, EARTHWORK

B. Section 02324, ROCK EXCAVATION AND DISPOSAL

C. Section 02631, PRECAST MANHOLES AND CATCH BASINS

Finance Committee - Agenda - 5/17/2017 - P368

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P368

E. Tape colors shall be as follows, as recommended by the American Public Works

Association (APWA):
Electric Red
Gas & Oil Yellow
Communications Orange
Water Blue
Sewer & Drain Green
Chemical Red (not APWA)

PART 3 - EXECUTION

3.01 INSTALLATION:

A. — Tracer tape shall be installed directly above the pipe or conduit it is to identify,

approximately 12 inches below the proposed ground surface.

B. — The Contractor shall follow the manufacturer's recommendations for installation of the

Finance Committee - Agenda - 5/17/2017 - P367

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P367

SECTION 02518

TRACER TAPE

PART 1 - GENERAL

1.01 WORK INCLUDED:

This section covers the furnishing, handling and installation of tracer tape, as called for on the
drawings.

1.02 SUBMITTALS: IN ACCORDANCE WITH REQUIREMENTS OF GENERAL
SPECIFICATIONS, SUBMIT THE FOLLOWING:

A. — Six sets of manufacturer's literature on the materials, colors and printing specified herein,

shall be submitted to the Engineer for review.

B. Tape samples shall also be submitted to the Engineer for review.

Finance Committee - Agenda - 5/17/2017 - P366

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P366

PART 3 - EXECUTION
3.01 OPERATION:

A. Contractor shall provide barricades, barrier fences, traffic signs, and other traffic control
devices as required by the Owner’s Traffic Control Officer, or as directed by the Engineer, to
protect traffic, pedestrians, and animals from the work area.

B. — Contractor shall relocate barricades, signs and other devices as necessary as the work
progresses as directed by the Owner’s Traffic Control Officer or the Engineer.

C. — Flaggers shall be provided with the necessary safety equipment.

Finance Committee - Agenda - 5/17/2017 - P365

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P365

SECTION 02451

FLAGGERS AND UNIFORMED OFFICERS FOR TRAFFIC CONTROL

PART 1 - GENERAL

1.01

A.

1.02

1.03

A.

B.

WORK INCLUDED:

This Section covers the provisions for furnishing Flaggers and Uniformed Officers for
Traffic Control and Maintenance of Traffic as described in Section 01110 CONTROL OF
WORK AND MATERIALS, to direct traffic through or around work as shown on the plans or
as ordered by the Engineer.

Finance Committee - Agenda - 5/17/2017 - P364

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P364

C. Two (2) DVD discs of the entire inspection shall be provided to the Engineer upon
completion of the inspection. The playback shall be at the speed that it was recorded.
The Contractor shall be required to have all discs and necessary playback equipment
readily accessible for review by the Engineer during the project.

D. The Contractor shall furnish printed internal inspection logs and two (2) DVD discs of the

entire inspection to the Owner on completion.

END OF SECTION

02441-4

Finance Committee - Agenda - 5/17/2017 - P363

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P363

B. Manual winches, power winches, TV cable and powered rewinds or other devices that do not

3.03

A.

3.04

A.

obstruct the camera view or interfere with proper documentation of the sewer
conditions shall be used to move the camera through the sewer line.

Whenever non remote powered and controlled winches are used to pull the television
camera through the line, telephones or other suitable means of communication shall be set up
between the two winches, the pumping unit and the monitor control.

Finance Committee - Agenda - 5/17/2017 - P362

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P362

PART2-PRODUCTS

2.01

A.

B.

EQUIPMENT:
DVD (Read only) video system shall be used which utilizes standard DVD recording discs.

Finance Committee - Agenda - 5/17/2017 - P361

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P361

SECTION 02441

CLEANING, TELEVISION INSPECTION, AND TESTING OF NEW PIPELINES

PART 1 - GENERAL

1.01

A.

1.02

1.03

1.04

WORK INCLUDED:

The Contractor shall furnish all materials, tools, labor and equipment necessary to visually
inspect by means of a closed-circuit television all gravity sewers installed under this
Contract, as hereinafter specified. The sewers shall be inspected throughout their entire

length. The Contractor shall also test all joints throughout the entire length of installed
sewer.