Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 5/17/2017 - P440

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P440

RESPONSIBILITIES

OWNER: City of Nashua

CONTRACTOR:

The following documents are attached to and made a part of this Certificate:

[For items to be attached see definition of Substantial Completion as supplemented and other specifically
noted conditions precedent to achieving Substantial Completion as required by Contract Documents.}

This certificate does not constitute an acceptance of Work not in accordance with the Contract Documents
nor is it a release of CONTRACTOR’s obligation to complete the Work in accordance with the Contract

Finance Committee - Agenda - 5/17/2017 - P439

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P439

CERTIFICATE OF SUBSTANTIAL COMPLETION

PROJECT:

OWNER’S CONTRACT NO:

DATE OF ISSUANCE:
OWNER: City of Nashua, NH

OWNER’s Purchase Order NO.:

CONTRACTOR:

ENGINEER: DPW Engineering

This Certificate of Substantial Completion applies to all Work under the Contract Documents or to the
following specified parts thereof:

TO City of Nashua
(OWNER)
And To
(CONTRACTOR)

Finance Committee - Agenda - 5/17/2017 - P438

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P438

Summary

CHANGE IN CONTRACT PRICE:

Original Contract Price

$

CHANGE IN CONTRACT TIMES:
Original Contract Times

Substantial completion:
Ready for final payment:

Net changes from previous Change Orders

$

Net change from previous Change Orders

Contract Price prior to this Change Order

$

Contract Times prior to this Change Order

Substantial completion:
Ready for final payment:

Net Increase (deerease} of this Change Order

$

Net Increase (decrease) of this Change Order

Finance Committee - Agenda - 5/17/2017 - P437

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P437

CHANGE ORDER

PROJECT:

OWNER’S CONTRACT NO:

EXECUTED CONTRACT DATE:

DATE OF ISSUANCE:

EFFECTIVE DATE:

OWNER:

OWNER’s Purchase Order NO.:

City of Nashua, NH

Upon City Approval

CONTRACTOR:

ENGINEER:

You are directed to make the following changes in the Contract Documents:

Description:

Justification:

Change Order #

1 of 2

Finance Committee - Agenda - 5/17/2017 - P436

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P436

NOTICE TO PROCEED

DATED:

TO:

(Contractor)

ADDRESS:

OWNER’S CONTRACT NO.

PROJECT:

(Insert name of Contract as it appears in the Bidding Document)

You are notified that the Contract Times under the above contract will commence to run on
20 . By that date, you are to start performing your obligations under the
Contract Documents. In accordance with Article 4 of the Agreement, the dates of Substantial
Completion and Final Completion are and
respectively.

Finance Committee - Agenda - 5/17/2017 - P435

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P435

SECTION 02930

DETECTABLE WARNING AT HANDICAP RAMP

SCOPE

A curb ramp shall have a detectable warning. The detectable warning shall extend the full
width of the curb ramp (exclusive of flared sides) and shall extend either the full depth of
the curb ramp or 24 inches (610 mm) deep minimum measured from the back of the curb
on the ramp surface.

MATERIALS AND CONSTRUCTION

Finance Committee - Agenda - 5/17/2017 - P434

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P434

chimney seals or liners. Contractor shall perform holiday detection testing in the presence
of an inspector with test equipment appropriate for the product. All detected holidays
shall be marked and repaired by abrading the coating surface with grit disk paper or
another hand-tooling method. After aorading and cleaning, additional coating shall be
hand-aoplied to the repair area as needed. All touch-up/reoair procedures shall be in
accordance with the coating manufacturer's recommendations. All verification and

Finance Committee - Agenda - 5/17/2017 - P433

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P433

3.07

Changes in direction of flow or sewer centerline within a manhole shall be made by
forming the flow channel along a smooth curve with as long of a radius as the inside of
the manhole will allow.

Bench shall slope toward invert as shown on the Rehabilitation of Existing Manhole detal|
on Drawing DO2 for proper drainage to the invert channel.

Benches shall be built up to a height as shown on the Rehabilitation of Existing Manhole

detail on Drawing DO2 for the entering and exiting pipes and shall be given a uniform
wood float finish.

Finance Committee - Agenda - 5/17/2017 - P432

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P432

3.05

materials handling, mixing, environmental controls, working time, working temperature,
pot life, allowable time between coats (recoat time), safety, and spray equipment. A
permanent identification and date of work performed shall be affixed to the structure in a
readily-visible location, and a final written report shall be provided to Owner and
Engineer detailing the location, date of report, and description of liner installation.

Finance Committee - Agenda - 5/17/2017 - P431

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P431

3.03

Active leaks shall be stopped with chemical or hydraulic sealants or cements prior to
installation.

All aveas to be sealed shall be dry, clean, and free of dust, dirt, sand, and othe
contaminants prior to installation. A torch may be required to ensure a dry surface.

Pagination

  • Previous page ‹‹
  • Page 1183
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact