Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 5/17/2017 - P450

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P450

c ‘
28 us ROAD RESTORATION:
2 7 5 N2& TEMPORARY
Oo m INSTALL NEW CB- LEMO 2" TEMP PAVE
“j = “INSTALL 8 LF + OF 10" REPLACE CB- D10952
- ove SEO EIRE CONNECTING PIPE. INSTALL 16 LF FINAL
* + OF 10" DIA PVC DRAIN PIPE 12" GRAVEL
RETAIN EXISTING SMH- $2968 INSTALL NEW #' DIA 2.25" BASE
SMH- LEMON 1
LIMIT OF WO
REMOVE EXITING 10"
CONCRETE PIPE
/ fF INSTALL 12" PVC PIPE
[ S 7 d | =
pees} 2] /\/\ 1S ees SAS —*

Finance Committee - Agenda - 5/17/2017 - P449

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P449

c ‘
ROAD RESTORATION:
TEMPORARY
2" TEMP PAVEMENT
FINAL
12" GRAVEL
2.25" BASE
ROW LINE REPLACE SERVICE CONNECTION TO ROW LINE,
MATCH EXISTING PIPE CONNECTION SIZE, 6" MIN. REPLACE CBIACKSONI &
LOCATION IS APPRO —
LIMIT OF WORK UNKNOWN. CYP) XIMATE AND LENGTH IS CONNECTING PIPE. INSTALL 8 LF + OF
10" PVC DRAIN PIPE.
LIMIT OF WORK
} |’ \ /
L
0+00 | 1 2 |
| WER sees} SEWER SE EReeene SEWER rN
| 2+90.40
|
XC INSTALL 12" PVC PIPE

Finance Committee - Agenda - 5/17/2017 - P448

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P448

f ‘
ROAD RESTORATION:
TEMP
2" TEMP PAVE
FINAL
12" GRAVEL
2.25" BINDER
REPLACE EXISTING SMH-S2554 REPLACE SEWER CONNECTION, MATCH
EXISTING PIPE SIZE, 6" MIN. LOCATION IS
APPROXIMATE & LENGTHG IS UNKNOWN
PLACE CB-14382 & CONHECTING PIPE.
INSTALL 18 + OF 10" PVC DRAIN PIPE
I
~
lu
FE
li
n
1 2 3 34+07.71
_ | © O— SEWER =e =a SEWER SEWER sees SEWER ee SEWER re - ©G—bD
INSTALL 12" PVC PIPE
ROW LINE /

Finance Committee - Agenda - 5/17/2017 - P447

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P447

505.45

LINE 24" CONCRETE PIPE

REPLACE CB - D14390 &
CONNECTING PIPE. INSTALL 24' +/-
OF 10" DIA PVC DRAIN PIPE

REPLACE 15" CONCRETE PIPE
WITH 12' +/- OF 15" DIA PVC

LINE EXISTING SMH - $2568

REPLACE SEWER LINE WITH
6" PVC. LOCATION IS APPROXIMATE
& LENGTH IS UNKNOWN.

LINE 24" CONCRETE PIPE

FILL. (ITEM 2m)

- ABANDON 15” CONCRETE
PIPE. FILL WTIH FLOWABLE

Finance Committee - Agenda - 5/17/2017 - P446

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P446

fc ‘
fr ROAD RESTORATION:
TEMPORARY
2" TEMP BASE
FINAL:
12" GRAVEL
2.5" BASE
1.5" TOP
REMOVE AND REPLACE CONNECT TO EXISTING SMH-S1895
SMH-S 1896 aa REPLACE ON 2006
REPLACE 24" TILE wit 2h" PVC PIPE
REMOVE AND REPLACE 1} |
SMH -S1897 REPLACE CB# ELM 9 & perce bo ELM 11 & CONNEGTING
CONNECTING PIPE. INSTALL PIPE. [INSTALL 11LF + OF 10" PVC PIPE.
REPLACE CB# ELM 7 & Lae |
CONNECTING PIPE. INSTALL TAL t C10" PVG PIPE. I {| Li

Finance Committee - Agenda - 5/17/2017 - P445

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P445

ROAD RESTORATION:

CIPP LINE 18" EGG SHAPE TEMPORARY
CEMENT PIPE REPLACE CB- D15092 & ou TEMP BASE
CONNECTING PIPE REPLACE CB- ELM 4 & CONNECTING FINAL
. PIPE. INSTALL 16 + OF 10" TIA PVC 12" GRAVEL
INSTALL 22 + OF 10" DIA DRAIN PIPE "
PVC DRAIN PIPE 3" BASE
1.5" TOP

ROW LINE

REPLACE CB- D15093 & CONNECTING
PIPE. INSTALL 21 + OF 10" DIA PVC

DRAIN PIPE
CIPP LINE 12" CEMENT PIPE

a OF WORK

5
een SEWER 8
—_— R 10
11

Finance Committee - Agenda - 5/17/2017 - P444

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P444

Ql!

LIMIT OF WORK

CIPP LINE 18" EGG SHAPE

CHMENT PIPE

REPLACE CB- D14305 &
CONNECTING PIPE INSTALL 31 +
IF 10" DIA PVC DRAIN PIPE

LINE EXISTING SMH- $2381

REMOVE TOP 3 VFOF DMH,
FILL WITH GRAVEL
RESTORE ROAD AS PER
SPECIFICATIONS (ITEM 2q)

CIPP LINE 18" EGG SHAPE
CEMENT PIPE

REPLACE CB-ELM1 &
CONNECTING PIPE. INSTALL 15' +
OF 10" DIA PVC DRAIN PIPE

[ ROW LINE

CIPP LINE 18" EGG SHAPE
CEMENT PIPE

0+00

L — a es

Finance Committee - Agenda - 5/17/2017 - P443

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P443

ROAD RESTORATION:
REPLACE CB-D11050 & CONNECTING TeMP
eRe TT 2" TEMP PAVE
\ FINAL
12" GRAVEL
2.25" BINDER
PROPOSED 4' sue $2945
ne748) REVAIN EXISTING
=a) [ SHM-S2573
2+48.1

2

& R SEWER mmmiemmmen SEWER mmm SEWER Sommer SEWER ) ©
EWER mamma SEWERS SEWE

0400 \, 5s —

REPLACE 10" TILE PIPE
WITH 12” PVC PIPE

\ ROW LINE
REPLACE CB-D11051 & CONNECTING

Finance Committee - Agenda - 5/17/2017 - P442

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P442

~
Remove | Remove | Remov Gomeect| nm | Comms MJ Remov Remove | Remove | Install 8 —
Reisting oe oan Remove Replace _— New N een c i li Slip Lining Cutting Semen “ain, D a a ee 1 le" Fitting for Aband Remove R .
5 ney 5 nee neg 5 need Existing Sewer MH| . ° oe Sewer to ek woth er Stromebark 210 LF of CIPP 6" CIPP | 8" CIPP |12" CIPP |15" CIPP| — and 5 ewer als wer 4 ond "Pe SDR35 ee Service or 6x 10" Pine °” | Existing Pipe by| Remove Top 3 ab “adened

Finance Committee - Agenda - 5/17/2017 - P441

By dnadmin on Mon, 11/07/2022 - 10:26
  • Read more about Finance Committee - Agenda - 5/17/2017 - P441

LAN

y 4
4 4
15 q
He
in
If

oe
-”
oe

pane,

aes

4
A

Cada

nd
(Laem

—
SS ns

~ SS w7 i ae 7 ¢

XX CIT YoFNASHUAS AZ

NS 1853. y
S316 73. Gee”

CITY OF NASHUA, NEW HAMPSHIRE

DRAWING INDEX

2017 SEWER PROJECT
PROPOSED WORK

RALLY

il

HORIZONTAL SCALE IN FEET
SCALE 1" = 1,000'-0"

MAYOR
HONORABLE JAMES DONCHESS

BOARD OF PUBLIC WORKS

Pagination

  • Previous page ‹‹
  • Page 1182
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact