Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 8/11/2020 - P119

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P119

Board Of Aldermen - Agenda - 8/11/2020 - P118

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P118

4 7 led T 181 Pearl Siveat end Figor
Touloukian Touloukian Inc. Boston MA 02170
Acohitecture + Urban Desian T+1 547 528 0884

ww torch com

27 July 2020

Greg Bakos, Principal Engineer
VHB

99 High Street,

10th Flocr. -.

Bosion, MA 02710

Re: Nashua Riverfront Parc ce la Renaissance Pavilion Project
cc: Bob Uhlig — Halvorson Tighe & Bond Studio (HTB)

Board Of Aldermen - Agenda - 8/11/2020 - P117

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P117

0Z0Z ‘LE Alnr :paredasy afeg

FIN ‘enysen jo AD

_00°091'Zr$ = TWLOL

ao - dusey pena Gumejay

Board Of Aldermen - Agenda - 8/11/2020 - P116

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P116

7. The VHB Project Manager / Program Lead will perform a quality assurance review of the 90%

8.

Plans, Specifications and Estimate
VHB will prepare and submit 0% Plans, Specifications and Estimate for review.

Phase 4~ 100% (Finai) Retaining Wall Design and Detailing:

1.
2.

3.

4.
5

Fee:

Address comments to 80% design (Phase 3) recommendations.

The cover sheet will be stamped by a licensed Professional Engineer, registered in the Staite of
New Hampshire.

Board Of Aldermen - Agenda - 8/11/2020 - P115

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P115

PRELIMINARY AND FINAL DESIGN PROPOSAL-PHASE 2, 3 & 4
Scope of Services, Tasks, and Fee
Structural Engineering Services
Retaining Wall Ramp at the Nashua Public Library, Nashua, NH
July 31, 2020

Scope of Services
Summary of Services:

Following is a summary of the professional engineering services required for Preliminary Design
(Phase 2), 90% Design (Phase 3), and Final Design (Phase 4). Note that conceptual design
(Phase 1) has been submitted to the City: so

Board Of Aldermen - Agenda - 8/11/2020 - P114

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P114

0202 ‘Le Aine :pasedaig ajyeq

30.3 - ABMH/EAA HeLIsape,d apug unyued

Board Of Aldermen - Agenda - 8/11/2020 - P113

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P113

« No Pan Am flaggers will be required for bridge inspection or other site visits. If flagging services
are required by the Railroad, all costs for flagging or other Railroad related services will be billed
directly to the City by the Railroad.

If work is required in any of the above areas noi previously described, VHB will prepare a
contract amendment to provide a separate description of service, fee, and schedute required to
complete the additional scope.

Board Of Aldermen - Agenda - 8/11/2020 - P112

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P112

5,
8.
7

8.

VHB will develop 90% rehabilitation plans for the pedestrian walkway. This plan set will include all
details, notes, and a complete quantity sheet. The pedestrian walkway will be constructed
according to the latest edition of the State of New Hampshire Department of Transportation
Standard Specifications for Road and Bridge Construction, unless otherwise amended by Pan
Am Railroad details.

Board Of Aldermen - Agenda - 8/11/2020 - P111

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P111

PRELIMINARY AND FINAL DESIGN PROPOSAL-PHASE 2, 3 & 4
Scope of Services, Tasks, and Fee
Structural Engineering Services
Rehabilitation of the Pedestrian Walkway on the Pan Am Railroad Bridge, Nashua, NH
July 31, 2020

scope of Services
Summary of Services:

Following is a summary of the professional engineering services required for Preliminary Design
(Phase 2), 99% Design (Phase 3), and Final Design (Phase 4). Note that conceptual design
(Phase 1} has been submitted to the City: -

Board Of Aldermen - Agenda - 8/11/2020 - P110

By dnadmin on Sun, 11/06/2022 - 23:06
  • Read more about Board Of Aldermen - Agenda - 8/11/2020 - P110

Oz0z ‘LE Aine :paiedarg ayeq

00°08z‘L6$ = 1VLOL

aa. - SHplig Jajsues_ uopyag 0] dwey sojanuuas

Pagination

  • Previous page ‹‹
  • Page 995
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact