Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 3/1/2021 - P22

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P22

LEGISLATIVE YEAR 2021
ORDINANCE: 0-21-045

PURPOSE: Amending the building construction ordinances and increasing
the building department fees

ENDORSER(S): Mayor Jim Donchess

COMMITTEE

ASSIGNMENT: Personnel/Administrative Affairs Committee

FISCAL NOTE: Increased fees will result in additional general fund revenues.
ANALYSIS

Board Of Aldermen - Agenda - 3/1/2021 - P21

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P21

ORDINANCE

(f)
(g)

(h)

O-21-045
Irrigation system (includes backflow preventer): $45--$20.
Backflow preventer (each):
[1] Atmospheric vacuum breakers: $44-$16.
[2] Pressure vacuum breakers: $14-$16.
[3] Dual check valve: $14-$16.
[4] Reduced-pressure principle: $44-$16.
Water pipes: (per 100 feet or part thereof}: $45-$18.
Sanitary sewer and storm drain connection or repair of: $45-$18.

Drainage, waste and vent pipes: (per 100 feet or part thereof): $415-
518.

(kK)

(aj())

Board Of Aldermen - Agenda - 3/1/2021 - P20

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P20

ORDINANCE

O-21-045

D. Plumbing permit fee schedule.

(1)

(2)

Residential plumbing (one- and two-family and townhouses).

(a)
(b)

Nonrefundable application processing and review fee: $30-$50.

Per fixture or fixture connection (tub, shower, sink, water closet,
lavatory, dishwasher, outside faucet, clothes-washing machine,
backflow preventer, etc.): $450-$9,50.

| —Tevigat aeludes bacle! $19

{8c}
€e)(d)
(e)
tof)
ay{2)

@)(h)

oO)

9)

Board Of Aldermen - Agenda - 3/1/2021 - P19

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P19

ORDINANCE

(g)
(h)

@)
(k)
()
(m)

(n)

(0)

(p}

(q)

()

O-21-045
Track lighting (each 10 feet): $6-$8.

Motor control centers (each), automatic transfer switches Ceach),
wiring of HVAC units (per unit): $32-$35.

Water heaters (each): $12-$15.

Electric baseboard heat (per unit): $8-$10.

Buss ducts (each section): $40-$15.

Transformers, generators, motors, x-ray machines (each): $22-$25
Paging and sound systems:

[1] Per speaker: $3-35.

Board Of Aldermen - Agenda - 3/1/2021 - P18

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P18

ORDINANCE

(2)

O-21-045

(f) Adding or relocating meter(s): $50-$55.

(g) Pools (in-ground): $58-$60.

(h) | Temporary service (each): $45-$50.

(i) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section:
$35-$40.

(i) Low voltage wiring (per square feet of work area): $0,080.

(kK) Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Board Of Aldermen - Agenda - 3/1/2021 - P17

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P17

ORDINANCE O-21-045

(d) Chimney or chimney liner (masonry or metal): $45. $90.

A(e) Fans: $25.$30.

)(f) Kitchen exhaust systems:

[1] Hoods and exhaust fans (each): $75-390.

(4}(g) Minimum fee for miscellaneous equipment (each), excluding the
application and review fee, where not otherwise provided for by
this section: $35. $45.

&)(h) Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Board Of Aldermen - Agenda - 3/1/2021 - P16

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P16

ORDINANCE

(2)

O-21-045

thi(g) Minimum fee for miscellaneous equipment (each), excluding the

(hb)

aw

application fee, where not otherwise provided for by this section:
$35-$40.

Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Surcharge for permits issued after construction started without a
permit: 100% of applicable fee, but not to exceed $275.

Commercial mechanical (including multifamily).

Board Of Aldermen - Agenda - 3/1/2021 - P15

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P15

ORDINANCE

(c)

(d)

Q-21-045

[1] Gas supply piping (base fee downstream of meter or
regulator set; test witnessed)-eaeh}: $0.30 per 1,000 BTUs.

34/2] Installation of fuel oil or propane storage tanks less than
499 gallons, fuel oil (each): $45- $30.

[3] Dormant Gas meter $45.

Equipment:

[i] Furnace, HRV/ERV., boiler or water heater: $49; $45.
[2] Water heater: $15-Generator including gas piping: $45.

[3]

>

$15-Ductless split system: $40.

Board Of Aldermen - Agenda - 3/1/2021 - P14

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P14

ORDINANCE

(8)
(9)

(10)

(14)

(12)

(13)

(14)

(15)

O-21-045

Certificate of Occupancy, existing space/owner change: $50.

Board Of Aldermen - Agenda - 3/1/2021 - P13

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P13

ORDINANCE

O-21-045

§ 105-2228. Fee Schedule.

A. Building permit fee schedule.

()

(2)

(3)

(4)

6)

(6)
(7)

A nonrefundable application processing and review fee shall be paid at the
time of filing of any application:

(a) Building permit: $33-$50

Pagination

  • Previous page ‹‹
  • Page 732
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact