Board Of Aldermen - Agenda - 3/23/2021 - P182
City of Nashua, New Hampshire
Division of Public Works
IFB0660-021121
2021 Paving Program - Residential Roadways
City of Nashua, New Hampshire
Division of Public Works
IFB0660-021121
2021 Paving Program - Residential Roadways
City of Nashua, New Hampshire
Division of Public Works
IFB0O660-0211 21
2021 Paving Program - Residential Roadways
DIVISION 7
LIST AND MAP OF ROADWAYS
29.
30.
D. If in the opinion of the CONTRACTOR, construction of an ADA compliant ramp is
not possible at any location the CONTRACTOR shall notify the ENGINEER in
writing in advance of any construction activities at that location. Unless notification
of any such concerns is made to the ENGINEER, CONTRACTOR shall be singularly
responsible for the ADA compliance of the finished work.
24.
25.
26.
27.
28.
Failure to promptly restore existing property and structures including, but not limited to
driveways and lawns, may result in the ENGINEER’s determination that associated work
is not complete and therefore not eligible for progress payment. Such associated work
may include, but not be limited to paving, pipe installation, catch basins, manholes and
curbing.
Unless specifically agreed to in advance, driveway tie-ins will be paved concurrent with
top course paving operations.
20.
21.
22.
23.
The CONTRACTOR shall plan in advance of forecasted inclement weather events and
shall assign crews to perform maintenance of unpaved areas open to traffic during and
after inclement weather events. CONTRACTOR is responsible to coordinate with the
ENGINEER and other City officials as appropriate.
CONTRACTOR shall be prepared to respond in a timely manner if the City determines
that circumstances warrant action when the CONTRACTOR is not onsite.
Master Plan Nashua Fire Rescue, NH
Master Plan
Nashua Fire Rescue, NH
Master Plan Nashua Fire Rescue, NH
Appendix C: Table of Figures
Master Plan Nashua Fire Rescue, NH
Response Time Performance Objectives