Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 9/28/2020 - P90

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P90

UREAN

Parking Strategy
Upon completion of the
proposed garages, the
Downtown core will be
well served with
parking, as denoted by
five minute walking

radii. (left)

A well-defined parking
lot in the beart of
Lowell, Massachusetts
illustrates that small,
surface parking areas
can be tucked in and
around buildings and
landscaped creating a

pleasant street wall.

(right)

DESIGN ASSOCIATES

Board Of Aldermen - Agenda - 9/28/2020 - P89

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P89

Nashua Downtown Master Plan

locations when it is needed. Determina-
tion of need should consider issues such
as the deleterious effect of excess park-
ing, the potential impacts on surrounding
properties, and the need to create a dense
unique urban environment for Down-

town.

Board Of Aldermen - Agenda - 9/28/2020 - P88

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P88

UREAN

DESIGN ASSOCIATES

Nashua Downtown Master Plan

The proposed buildings would have Hilustrative Plan ofa 58
retail businesses at street level with redeveloped Hollis and
offices above. The offices could be used Main Street
by the hospital, or physicians offices, or ntersection
other businesses seeking office space in
the heart of Downtown.

At the easternmost part of the block,

Board Of Aldermen - Agenda - 9/28/2020 - P87

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P87

URBAN DESIGN ASSOCIATES

site. When market forces dictate redevel-
opment of the site, the City should part-
ner with Citizen's bank to create a legacy
project.

Board Of Aldermen - Agenda - 9/28/2020 - P86

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P86

UREAN

Ffollis and Main
Street: The region’
100% Corner

DESIGN ASSOCIATES

this intersection. A series of distinct, 4-
to 6-story, mixed-use buildings wold cre-
ate a center to the Downtown. They
buildings would anchor both ends of
Main Street by creating a strong center.
and transform an anonymous intersec-

tion into the region’s symbolic heart.

Board Of Aldermen - Agenda - 9/28/2020 - P85

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P85

DESIGN ASSOCIATES

Board Of Aldermen - Agenda - 9/28/2020 - P84

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P84

URBAN DESIGN ASSOCIATES

Benches

Several benches along
Main Street are poorly
located. Benches that
face traffic or are located
in the middle of
sidewalks are rarely
used, Where possible,
benches should either be
paired, facing each
other, or they should be
located with their backs
to storefronts.

Diagrams
Inappropriate bench
location (below left}

Appropriate bench
location (below right}

Board Of Aldermen - Agenda - 9/28/2020 - P83

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P83

UREAN

DESIGN ASSOCIATES

Streetscaping

Maintenance and upgrades to the
streetscape of Main Street is critical.
Begun in the early 1980's, the streetscape
program has been a great success. The
comfortably wide sidewalks, warm red
bricks, and the canopy of street trees cre-
ate a pedestrian environment that has
been instrumental in Main Street’s resur-

gence over the past 15 years. However,

Nashua Downtown Master Plan

some sidewalk bricks have been dis-

Board Of Aldermen - Agenda - 9/28/2020 - P82

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P82

UR EAN DESIGN assocrates Nashua Downtown Master Plan

v. Main Street North

MAIN STREET NORTH 18 healthy. Also referred to as “walking 52
Main Street”, there are almost no retail vacancies, sidewalks are
active, and there is a vibrant mix of retail, offices and restau-

rants. Behind Main Street on both sides, however, significant
attention is required. The seam between the neighborhoods

and Main Street North is ragged. Spring Street and Elm Street

are characterized by disinvestment, surface parking lots, and

Board Of Aldermen - Agenda - 9/28/2020 - P81

By dnadmin on Sun, 11/06/2022 - 22:59
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P81

DESIGN ASSOCIATES

Development Opportunities
Most of the buildings on Railroad
Square are worthy of preservation. While
several buildings may be renovated, one
site is identified for new construction. It
is important that new construction as
well as renovation adhere to strict archi-
tectural design guidelines, based on
Nashua’s historic architectural traditions.

The most important renovation proj-
ect will be the Laton Hotel. Specifically,
the striking double-level porch should be
restored

Pagination

  • Previous page ‹‹
  • Page 1097
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact