Board Of Aldermen - Agenda - 9/28/2020 - P130
\Whbipry\Badior!\52700,00 Nashua
Circulation Stuetyveparts\Final Report Final
@ Vanasse Hangen Brustlin, Inc.
Table of Contents
_
Executive Summary auacageanaaad neaaeuanaasnsaTinnaTeveainaried
\Whbipry\Badior!\52700,00 Nashua
Circulation Stuetyveparts\Final Report Final
@ Vanasse Hangen Brustlin, Inc.
Table of Contents
_
Executive Summary auacageanaaad neaaeuanaasnsaTinnaTeveainaried
@ Vanasse Hangen Brustlin, Inc.
Downtown Circulation Study
Nashua, New Hampshire
Prepared for
The City of Nashua, NH
Prepared by
Vanasse Hangen Brustlin, Inc.
Bedford, New Hampshire
January, 2015
\iwhitipray\BedloriS2700.00 Nashua
Circulation Studyireports\Final RepartiFinal
Repart.decr
Final Report
Downtown Circulation Study
Nashua, New Hampshire
Prepared for City of Nashua, New Hampshire
Prepared by VHB/ Vanasse Hangen Brustlin, Inc.
Bedford, New Hampshire
January, 2015
Appendix C
2015 Downtown Circulation Study
UREAN
DESIGN ASSOCIATES
Nashua Downtown Master Plan
Key
C1 New Streets
Improved Streets
1 Parks and Trails
1 Parking Structures
Public Infrastruc- 96
ture
The Master Plan
recommends public
action be taken to crate
infrastructure that will
leverage substantial
private investment.
Infrastructure
Quantities
UR EAN DESIGN assocrates Nashua Downtown Master Plan
Broad Street Park-
way
lief}
Oumership
fright}
Tlustrative Plan
Nashua Center For
Heritage and
Future Technology
(left)
Oumership
fright}
Tlustrative Plan
L
Key
OO Os Private Ownership
Public Ownership
Oo
Institutional Ownership
95
UR EAN DESIGN assocrates Nashua Downtown Master Plan
Riverfront East L cL 7 ay
Park and Sa =
ae
Performing Arts
Center
ftep}
Oumership
(bottom)
Tlustrative Plan
O O Private Ownership
Public Ownership
Oo Institutional Ownership
UR EAN DESIGN assocrates Nashua Downtown Master Plan
Riverfront West
Park
(top)
Ownership
(bottom)
Tlustrative Plan
Private Ownership
Public Ownership
Institutional Ownership
93
UR EAN DESIGN assocrates Nashua Downtown Master Plan
Bronstein Homes
(top)
Oumership
(bottom)
Tlustrative Plan
Acquisition and Strategy most cases much of the required property 92
Many of the Master Plan initiatives, par- is either owned by a single private entity
ticularilly those listed in the previous sec- or by a public body.
tion as priority projects will be relatively
simple to implement because of the lack
of complicated property acquisition. In
Private Ownership
Public Ownership
UR EAN DESIGN assocrates Nashua Downtown Master Plan
Phasing of Priority Projects
The priority projects within the first
phase of implementation will include
* Main Street South (Design and
Engineering)
* Bronstein Homes (Design and Hope
VI Application)
* Broad Street Parkway (Design and
Engineering)
+ One Way Street Conversion Study
+ Center for Nashua Heritage and
Future Technology (fundraising)
The priority projects within the second
phase of implementation (years 3-6) will
include: