Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 9/28/2020 - P190

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P190

Appendix D

Performing Arts Center Feasibility Study

Board Of Aldermen - Agenda - 9/28/2020 - P189

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P189

\whbiprofiBediord\2700,00 Nashua
Cyreulation Study\reporis'Fina! ReportiFina!
Aapor. doce

@ Vanasse Hangen Brustlin, Inc.

49

both sides of the roadway, the City would need to reduce the approximately
8’ wide sidewalk on the south side of the west end of West Hollis Street by
approximately 2 feet. This additional roadway width could accommodate
two 10’ travel lanes in addition to maintaining on-street parking on both
sides of the roadway. This modification to the sidewalk is estimated to cost
approximately $20,000.

Board Of Aldermen - Agenda - 9/28/2020 - P188

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P188

@ Vanasse Hangen Brustlin, Inc.

bicyclists traveling in the same direction. This type of signal phasing, as opposed to
exclusive pedestrian phasing that only allows pedestrians to cross when vehicles on
all approaches to the intersection are stopped, would provide enhance both
pedestrian and vehicular mobility.

Next Steps

\whbipraj\BediontS2700 00 Nashua
Gireulation Stucywreports'Final ReportFinal
Report docx

48

Board Of Aldermen - Agenda - 9/28/2020 - P187

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P187

\WwhbiiprofiBedionfiS2700,00 Nashua
Circulation Sludyveports\Final RaportFinal
Report.docn

@

47

Vanasse Hangen Brustlin, Inc.

Hollis Street /Spring Street traffic signal. Also, patrons of the Post Office would no
longer be able to queue along one of the travel lanes when the parking lot gets
congested (as they do today) as the northbound traffic would be limited to one lane.
Nevertheless, if the City is committed to begin to convert some of its one-way streets
to two-way, Spring Street may be a good location to start.

Board Of Aldermen - Agenda - 9/28/2020 - P186

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P186

\Wwhbprof\Bextterd$27100.00 Nashua
Circulation Studyreparts\Final ReporfiFinal
Report.docx

46

Vanasse Hangen Brustlin, Inc.

Factory Street

Board Of Aldermen - Agenda - 9/28/2020 - P185

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P185

\Wwhtipro/iBemon\S2 700.00 Nashua
‘Ciroulabon Study\raports\Final ReportFinal
Report dock,

@

45

Vanasse Hangen Brustlin, fic.

Study Findings

Board Of Aldermen - Agenda - 9/28/2020 - P184

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P184

@ Vanasse Hangen Brustlin, Inc.

* Maintain one-way operation East Hollis Street and East Pearl Street, but
convert Spring Street to two-way.

* Consider any circulation modifications within the context of future land
development projects.

These and many other comments and suggestions were considered in the
development of the Study Findings.

Viwhbiprof BedlorhS2700.00 Nashua AA
Chreulalion Study\eporis\Final Report\Final
Report.doc

Alternatives Evaluation

Board Of Aldermen - Agenda - 9/28/2020 - P183

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P183

@

Vanasse Hangen Brustlin, Inc.

BY ed

3-4 Seconds Remainder of Time
moe Sa

oo

Figure 25: Concurrent Pedestrian Crossing with Early Release

3.2 Public Outreach Process

\whbprof\BedlonfiS2700.00 Nashua
Circulation Studyreports\Fingl ReportFinal
Report.darx

43

Board Of Aldermen - Agenda - 9/28/2020 - P182

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P182

®

Vanasse Hangen Brustlin, Inc.

Figure 24: Concurrent Pedestrian Crossing

A comparison of exclusive pedestrian phasing to concurrent pedestrian phasing is
summarized as follows:

Board Of Aldermen - Agenda - 9/28/2020 - P181

By dnadmin on Sun, 11/06/2022 - 23:00
  • Read more about Board Of Aldermen - Agenda - 9/28/2020 - P181

@ Vanasse Hangen Brustlin, Inc.

Street. Connection to Pearson Street would be maintained through the existing
parking lot. Prior to the City advancing the conversion to two-way flow along Court
Street and Park Street it would be advantageous to work with the owner of the 30
Temple Street property to consider whether a reconfiguration of the Court
Street/Temple Street intersection could be coordinated with any development
proposal.

B 3.1.8 Pedestrian Signal Phasing

Pagination

  • Previous page ‹‹
  • Page 1087
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact