Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 9/22/2020 - P105

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P105

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI recommends the replacement of existing efficient transformers in order to improve the energy
efficiency of the electrical distribution systems through the replacement of the transformers with
new high efficiency units. The scope of work for this measure would include upgrading:

32 Transformers

(5) ISKVA
(4) 30 kVA
(2) 45 kVA
(1) 75 kVA
(6) 112.5 kVA
(1) 145kVA
(1) 150kVA
(1) 175 kVA
(3) 220 kVA
(4) 225 kVA
(2) 300 kVA
(2) 500 kVA

Board Of Aldermen - Agenda - 9/22/2020 - P104

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P104

| oI

ENERGY EFFICIENT INVESTMENTS INC.

EEI proposes installing a complete DDC system as an extension of the existing N4 Enterprise
Supervisor.

Scope of work:

Demo the existing VAV controllers, keeping the existing communication wiring operational for the
existing controllers. Install new BACnet IP DDC controllers, new space sensors, and new discharge air
sensors. Install network controller hardware and software updates as needed.

Board Of Aldermen - Agenda - 9/22/2020 - P103

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P103

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Nashua North High School

ECM 1- LED Lighting

The schools currently utilize a combination of T8 and TS fluorescent lighting. EEI proposes replacing the
existing fixtures with new LED lighting. EEI performed a detailed survey of the interior and exterior spaces
in order to identify opportunities in which we can improve lighting quality, reduce maintenance costs, and
save energy.

Board Of Aldermen - Agenda - 9/22/2020 - P102

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P102

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM: Nashua South High School

M&V Option Used

1. LED Lighting Option A
2. Controls Upgrade Option C
3. Weatherization Option C
4, Transformers Option B
5, Retro-Commissioning Option C
6. Mini Splits Option B
7, Condensing Hot Water Option A
8. Targeted Balancing Option A
9. Kitchen Hood Option B
10, Walk In Coolers Option B

Board Of Aldermen - Agenda - 9/22/2020 - P101

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P101

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Project Overview

1, PROJECT SUMMARY

The goal of this project is to achieve energy savings through upgrades to the buildings’
electrical, plumbing, mechanical, and building envelope. This project will result in improved
building performance, thereby reducing energy and maintenance costs.

School Address SF
Nashua North High School 8 Titan Way 420,000
Nashua South High School 36 Riverside St. 430,000

2. M&V OPTION SUMMARY

Board Of Aldermen - Agenda - 9/22/2020 - P100

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P100

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Introduction

This Measurement and Verification Plan has been prepared as a guide in determining the energy savings as a

result of the installed Energy Conservation Measures. In this document, EEI will show the baseline
calculations used to determine cost savings and how we can evaluate the installed measures to ensure the
Savings Guarantee is being satisfied.

Board Of Aldermen - Agenda - 9/22/2020 - P99

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P99

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Table of Contents

Board Of Aldermen - Agenda - 9/22/2020 - P98

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P98

IKE]

ENERGY EFFICIENT INVESTMENTS ING.

Energy Efficient Investments, Inc.

Measurement and Verification
Annual Report
Period: 2016-2018 Baseline

For:

Nashua, NH School District

Prepared by:
EE], Inc.
Energy Advisors Group
Steve Tarantino, LEED AP O+M, EIT

Prepared on:

01/27/20

Board Of Aldermen - Agenda - 9/22/2020 - P97

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P97

Attachment 4 - Measurement and Verification Plan

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Board Of Aldermen - Agenda - 9/22/2020 - P96

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P96

Attachment 3 - Project Cost

eR rita

Nashua North High School

Cost for Installed
Measure $

Pele er Mad
E

Pree B Corea

Annual Electric
Savings (kWh)

Annual Natural CO? Emmisions

Gas Savings
(Therm)

Reduction
facie)

PT emarsha tts la 4

Pagination

  • Previous page ‹‹
  • Page 1062
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact