Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 9/9/2020 - P175

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P175

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Existing rail right of 49
way behind Cattleman’s

(top)

Proposed rail right of
way, redevelopment
and trail connection.
(bottom)

Board Of Aldermen - Agenda - 9/9/2020 - P174

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P174

DESIGN ASSOCIATES

A new parking garage may have to be
built to support this facility. A site along
Spring Street, just south of Temple
Street, is recommended. The BAE Sys-
tems parking lot, located on the north
side of the river should be considered a
parking resource for the Performing Arts
Center. If the dam structure is modified
to contain a pedestrian walk, the BAE
Parking lot will be less than a five minute

walk from the Performing Art Center.

Nashua Downtown Master Plan

Temple Street Neighborhood

Board Of Aldermen - Agenda - 9/9/2020 - P173

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P173

DESIGN ASSOCIATES

park system and regional trail system
should be developed at this location.

Board Of Aldermen - Agenda - 9/9/2020 - P172

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P172

URBAN DESIGN ASSOCIATES

Riverfront East Park

A new riverfront park is proposed along
both sides of the river. The park will be
narrow and linear. It will be active with
trails but not with recreation areas. The
dam and the railroad bridge should be
developed with pedestrian and bike
trails. The trail on the south side of the
Nashua River should be improved with
additional connections to an extended
Park Street and selective clearing of trees

and shrubbery.

Nashua Downtown Master Plan

Board Of Aldermen - Agenda - 9/9/2020 - P171

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P171

UR EAN DESIGN assocrates Nashua Downtown Master Plan

There are, however, similarities. Like 45
Riverfront West, Riverfront East is pro-
posed to become a single place on both
sides of the river with the river as the
focus. The current trails are discontinu-
ous, inaccessible, and perceived as dan-

gerous. Many of the buildings back onto

the river with parking lots, service alleys,

and backyards.

Initiatives

Board Of Aldermen - Agenda - 9/9/2020 - P170

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P170

UR EAN DESIGN assocrates Nashua Downtown Master Plan

III R verfront East RIVERFRONT EAST PRESENTS A DIFFERENT experience and
opportunity than Riverfront West. The riverbanks are steeper,
and the river is more narrow. The crashing waterfall of River-

front East contrasts with the tranquility of the wetland pockets

at Riverfront West.

Riverfront East

Board Of Aldermen - Agenda - 9/9/2020 - P169

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P169

URBAN DESIGN ASSOCIATES

Board Of Aldermen - Agenda - 9/9/2020 - P168

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P168

DESIGN ASSOCIATES

road will access these sites and create a
connection to Mine Falls Park. Redevel-
opment of the Millyard will create multi-
ple trail connections between Main
Street and Mine Falls Park.

Courthouse Oval and Other

Street Improvements

Board Of Aldermen - Agenda - 9/9/2020 - P167

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P167

URBAN DESIGN ASSOCIATES

discussion of the Broad Street Parkway is
located in the Transportation Appendix.)

Bronstein Apartments

Currently an inward facing public hous-
ing project, the Master Plan proposes a
transformation of the 48 units of public
housing into a 100-unit, mixed-income,
mixed-financed neighborhood. The ori-
entation and condition of the existing
units are such that rehabilitation or mod-
ernization will provide only marginal
improvements in the quality of life.

Board Of Aldermen - Agenda - 9/9/2020 - P166

By dnadmin on Sun, 11/06/2022 - 23:03
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P166

UREAN

DESIGN ASSOCIATES

nections

* not a Downtown bypass

The Master Plan recommends the Broad
Street Parkway connect to Franklin
Street as well as the Millyard. This align-
ment will route through-traffic directly
across Railroad Square, thereby alleviat-
ing the cumbersome dogleg movement

that currently exists.

Nashua Downtown Master Plan

Pagination

  • Previous page ‹‹
  • Page 1031
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact