Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Board Of Aldermen

Board Of Aldermen

Board Of Aldermen - Agenda - 9/9/2020 - P215

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P215

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Residential Design Guidelines Typical massing of 89

The Master Plan identifies several sites houses (top)
throughout Downtown for new housing.

‘These sites fall into two categories: (1) Detait of
tail of entrance

extensions and insertions into old neigh-
(second)

borhoods and (2) former commercial or
industrial sites.

Board Of Aldermen - Agenda - 9/9/2020 - P214

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P214

DESIGN ASSOCIATES

Main Street between Otterson and

Salmon Brook

Urban Design Intent

‘The urban design intent in this area is to
concentrate Downtown’s retail growth
potential in a second retail node along
Main Street South by creating mixed-use
buildings with mandatory, traditional
retail storefronts on the round floor.
Broad sidewalks, street trees, on-street
parking, awnings, and active storefronts
will create a vibrant pedestrian-oriented

retail node.

Nashua Downtown Master Plan

Board Of Aldermen - Agenda - 9/9/2020 - P213

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P213

DESIGN ASSOCIATES

Main Street between Hollis and
Otterson

Urban Design Intent

Board Of Aldermen - Agenda - 9/9/2020 - P212

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P212

UR EAN DESIGN assocrates Nashua Downtown Master Plan

ll Design Guidelines DESIGN GUIDELINES ARE NECESSARY to encourage new devel- 86
opment along Main Street South and to reinforce and support

the overall goals of this Master Plan. The design guidelines

that follow can be applied to new private development oppor-

tunities along Main Street South, between Hollis Street and

Salmon Brook Park. Within this area, however, the Master

Plan defines two very different areas of development:

Board Of Aldermen - Agenda - 9/9/2020 - P211

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P211

Nashua Downtown Master Plan

* serve an economic development
objective by providing a valuable
leisure activity for individuals and
families.

The idea of an extensive trail system is

already a part of the City's 1993 Trails

Plan, adopted as part of the City’s Mas-

ter Plan, as well as the region's long-

range plan. This Master Plan illustrates
how trail systems can be implemented by
private and public initiatives recom-
mended in this Plan.

Board Of Aldermen - Agenda - 9/9/2020 - P210

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P210

UR EAN DESIGN assocrates Nashua Downtown Master Plan

Board Of Aldermen - Agenda - 9/9/2020 - P209

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P209

Nashua Downtown Master Plan

A two-lane cross-section will reduce the
cost of the roadway significantly yet will
not reduce its effectiveness.

The Parkway should incorporate trail
elements that substantially implement
the City's Master Plan for trails and
greenways.

All efforts should be made to pre-
serve and protect the Tree Streets Neigh-
borhood, located at the road's southern
terminus. The greatest impacts will likely

occur on Elm Street between Hollis and

Board Of Aldermen - Agenda - 9/9/2020 - P208

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P208

Nashua Downtown Master Plan

neighborhoods, and creation of new
neighborhood fabric, particularly at
the southern end of the Parkway. The
preferred alternative does this
through a downsized street, the
adoption of urban street design
guidelines, and the connection to the
existing street system at numerous

points.

+ Multi-Modal The preferred design is
multi-modal, providing connections
to the regional trail system and

extension of the local trail system.

Board Of Aldermen - Agenda - 9/9/2020 - P207

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P207

Nashua Downtown Master Plan

Board Of Aldermen - Agenda - 9/9/2020 - P206

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P206

UREAN

DESIGN ASSOCIATES

should not be provided. A two-lane
roadway provides an increment of
capacity that is far more than ade-
quate for any reasonable projection of
new downtown growth in Nashua.

+ Address Value The design features
of the preferred Parkway — specifi-
cally its accessibility, design speed
and size — should add to the value of

the road as an address. Supporting

Nashua Downtown Master Plan

City policies (zoning, redevelopment Bo
initiatives, etc.) should foster the role

Pagination

  • Previous page ‹‹
  • Page 1027
  • Next page ››
Subscribe to Board Of Aldermen

Footer menu

  • Contact