\WwhbiprofiBediord\2700,00 Nashua
Cyreulation Study\reporis'Fina! ReportFina!
Aapor. doce

@ Vanasse Hangen Brustlin, Inc.

49

both sides of the roadway, the City would need to reduce the approximately
5' wide sidewalk on the south side of the west end of West Hollis Street by
approximately 2 feet. This additional roadway width could accommodate
two 10’ travel lanes in addition to maintaining on-street parking on both
sides of the roadway. This modification to the sidewalk is estimated to cost
approximately $20,000.

Board Of Aldermen - Agenda - 9/9/2020 - P284

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P284

@ Vanasse Hangen Brustlin, Inc.

bicyclists traveling in the same direction. This type of signal phasing, as opposed to
exclusive pedestrian phasing that only allows pedestrians to cross when vehicles on
all approaches to the intersection are stopped, would provide enhance both
pedestrian and vehicular mobility.

Next Steps

\whb\praj\BediontS2700 00 Nashua
Gireulation Stucywreports'Final ReportFinal
Report docx

48

Board Of Aldermen - Agenda - 9/9/2020 - P283

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P283

\WwhbiprofiBadiordiS2700.00 Nashua
Circulation Sludyvreports\Final RaportFinal
Report.docn

@

47

Vanasse Hangen Brustlin, Inc.

Hollis Street /Spring Street traffic signal. Also, patrons of the Post Office would no
longer be able to queue along one of the travel lanes when the parking lot gets
congested (as they do today) as the northbound traffic would be limited to one lane.
Nevertheless, if the City is committed to begin to convert some of its one-way streets
to two-way, Spring Street may be a good location to start.

Board Of Aldermen - Agenda - 9/9/2020 - P282

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P282

\whb\projiBedterd$27100.00 Nashua
Circulation Studyreports!Fina! AeportiFinal
Raport.dack

46

Vanasse Hangen Brustlin, Inc.

Factory Street

Board Of Aldermen - Agenda - 9/9/2020 - P281

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P281

\(whbipra)iBedlonf\52700.00 Nashua
‘Ciroulabon StudyiraportsiFinal ReportFinal
Raepor docs

@

45

Vanasse Hangen Brustlin, Inc.

Study Findings

Board Of Aldermen - Agenda - 9/9/2020 - P280

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P280

@ Vanasse Hangen Brustlin, Inc.

* Maintain one-way operation East Hollis Street and East Pearl Street, but
convert Spring Street to two-way.

* Consider any circulation modifications within the context of future land
development projects.

These and many other comments and suggestions were considered in the
development of the Study Findings.

\WwhbigeofiBedlordiS2700.00 Nashua 44
Chrevlalion Study\eporis\Final Report\Final
Report.dacx

Alternatives Evaluation

Board Of Aldermen - Agenda - 9/9/2020 - P279

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P279

@

Vanasse Hangen Brustlin, lic.

Be Ed

3-4 Seconds Remainder of Time
me Sa

, a

Figure 25: Concurrent Pedestrian Crossing with Early Release

3.2 Public Outreach Process

\whb\prof\BedlonfiS2700.00 Nashua
Circulation Studyeports\Final ReportFinal
Report.darx

43

Board Of Aldermen - Agenda - 9/9/2020 - P278

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P278

®

Vanasse Hangen Brustlin, Inc.

"<<< = =

Figure 24: Concurrent Pedestrian Crossing

A comparison of exclusive pedestrian phasing to concurrent pedestrian phasing is
summarized as follows:

Board Of Aldermen - Agenda - 9/9/2020 - P277

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P277

@ Vanasse Hangen Brustlin, Inc.

Street. Connection to Pearson Street would be maintained through the existing
parking lot. Prior to the City advancing the conversion to two-way flow along Court
Street and Park Street it would be advantageous to work with the owner of the 30
Temple Street property to consider whether a reconfiguration of the Court
Street/Temple Street intersection could be coordinated with any development
proposal.

B 3.1.8 Pedestrian Signal Phasing

Board Of Aldermen - Agenda - 9/9/2020 - P276

By dnadmin on Sun, 11/06/2022 - 23:04
  • Read more about Board Of Aldermen - Agenda - 9/9/2020 - P276

@

Vanasse Hangen Brustlin, Inc.

existing condition with use of concurrent pedestrian crossings, even with the added
signal phase for the Spring Street approach that reduces existing intersection capacity
by four to seven percent during the peak hours.

@ 3.1.7 Park Street and Court Street

\Wwhb'ipraf\Bedioni52700,00 Nashua
Circulation Study\reports\Final ReportiFinal
Repart.dacx