Board Of Aldermen - Agenda - 9/28/2020 - P146
@
Vanasse Hangen Brustlin, Inc.
public streets, but also include internal connections on and between building sites.
@
Vanasse Hangen Brustlin, Inc.
public streets, but also include internal connections on and between building sites.
3/5/2013
\wnh-bed\projects\52700.00 Nashua Circulation Study\cad\ts\planset\ReportFigures.dgn
——
—>P-
Pine Street
Palm Street
Vane
Myrtle Streez
Central Street oon 4
<——
Ash Street
W, Hollis Street gm
Lae
Y
—_>
Vine Street
Chestnut Street ~<—
t
t Y
W, Pearl Street
eee ween ene
Cedar Street
<<
Pleasant Street
wl
oO
oO
—
s
® o o
2 8 £
o o uy
= <=
=
2/22/2013 \\nh-bed\projects\52700.00 Nashua Circulation Study\cad\ts\planset\ReportFigures.dgn
PEGOONOOC! (004
i
I
Figure 2
Broad Street Parkway
Concept Plan
@ Vanasse Hangen Brustlin, Inc.
@ Vanasse Hangen. Brustlin, Inc.
Existing Conditions
ES — eae
2.1 ~—_—‘ Introduction
3/5/2013 + \\nh-bed\projects\52700.00 Nashua Circulation Studyicad\ts\planset\ReportFigures.dgn
a Le. — ius s ;
TO
on ull
=| .
+
om
id
=
rw
=
=
8
te
Suit Stee
eu 1-S eal
At) ow
i 3 W. ae
> a
LEGEND
7 General Study Area Limits
—_—— Directional Traffic Flow Figure I
© Existing Traffic Signal Study Area
Future Traffic Signal
© (To be constructed by the
2 ee Broad Street Parkway Project)
600 Feet
@ Vanasse Hangen Brustlin, Inc.
Introduction
i eS}
1.1. Project Background
\whibipro)Bedtord\S2700,00 Nastia
Circulation StudyraportsFinal Report\Fina!
Fapon doc,
@ Vanasse Hangen Brustlin, Inc.
8
roadway width could accommodate two 10’ travel lanes in addition to
maintaining on-street parking on both sides of the roadway. This
modification to the sidewalk is estimated to cost approximately $20,000.
@ Vanasse Hangen Brustlin, Ic.
Concurrent Pedestrian Signal Phasing
\Whblprof\BedforchS2700 00 Nashua
Circulation Study\reports\Final RaportFinal
Report doce
@ Vanasse Hangen Brustlin, Inc.
6
Hollis Street/Spring Street traffic signal. Also, patrons of the Post Office would no
longer be able to queue along one of the travel lanes when the parking lot gets
congested (as they do today) as the northbound traffic would be limited to one lane.
Nevertheless, if the City is committed to begin to convert some of its one-way streets
to two-way, Spring Street may be a good location to start.