ENERGY EFFICIENT INVESTMENTS INC.

Nashua North High School

ECM 1- LED Lighting

The schools currently utilize a combination of T8 and TS fluorescent lighting. EEI proposes replacing the
existing fixtures with new LED lighting. EEI performed a detailed survey of the interior and exterior spaces
in order to identify opportunities in which we can improve lighting quality, reduce maintenance costs, and
save energy.

Board Of Aldermen - Agenda - 9/22/2020 - P102

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P102

| oI

ENERGY EFFICIENT INVESTMENTS INC.

ECM: Nashua South High School

M&V Option Used

1. LED Lighting Option A
2. Controls Upgrade Option C
3. Weatherization Option C
4, Transformers Option B
5, Retro-Commissioning Option C
6. Mini Splits Option B
7, Condensing Hot Water Option A
8. Targeted Balancing Option A
9. Kitchen Hood Option B
10, Walk In Coolers Option B

Board Of Aldermen - Agenda - 9/22/2020 - P101

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P101

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Project Overview

1, PROJECT SUMMARY

The goal of this project is to achieve energy savings through upgrades to the buildings’
electrical, plumbing, mechanical, and building envelope. This project will result in improved
building performance, thereby reducing energy and maintenance costs.

School Address SF
Nashua North High School 8 Titan Way 420,000
Nashua South High School 36 Riverside St. 430,000

2. M&V OPTION SUMMARY

Board Of Aldermen - Agenda - 9/22/2020 - P100

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P100

ENERGY EFFICIENT INVESTMENTS INC.

| oI

Introduction

This Measurement and Verification Plan has been prepared as a guide in determining the energy savings as a

result of the installed Energy Conservation Measures. In this document, EEI will show the baseline
calculations used to determine cost savings and how we can evaluate the installed measures to ensure the
Savings Guarantee is being satisfied.

Board Of Aldermen - Agenda - 9/22/2020 - P99

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P99

| oI

ENERGY EFFICIENT INVESTMENTS INC.

Table of Contents

Board Of Aldermen - Agenda - 9/22/2020 - P98

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P98

IKE]

ENERGY EFFICIENT INVESTMENTS ING.

Energy Efficient Investments, Inc.

Measurement and Verification
Annual Report
Period: 2016-2018 Baseline

For:

Nashua, NH School District

Prepared by:
EE], Inc.
Energy Advisors Group
Steve Tarantino, LEED AP O+M, EIT

Prepared on:

01/27/20

Board Of Aldermen - Agenda - 9/22/2020 - P97

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P97

Attachment 4 - Measurement and Verification Plan

ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019

Board Of Aldermen - Agenda - 9/22/2020 - P96

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P96

Attachment 3 - Project Cost

eR rita

Nashua North High School

Cost for Installed
Measure $

Pele er Mad
E

Pree B Corea

Annual Electric
Savings (kWh)

Annual Natural CO? Emmisions

Gas Savings
(Therm)

Reduction
facie)

PT emarsha tts la 4

Board Of Aldermen - Agenda - 9/22/2020 - P95

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P95

Attachment 2 - Maintenance and Service Agreements

To ensure the guarantee School District must maintain equipment as required by
Operational and Maintenance Manuals / Manufacturer Recommendations of all
equipment provided under this contract.

Board Of Aldermen - Agenda - 9/22/2020 - P94

By dnadmin on Sun, 11/06/2022 - 23:02
  • Read more about Board Of Aldermen - Agenda - 9/22/2020 - P94

measure would include checking the air flow at the diffusers to ensure that it meets
current code required flow.

ECM 9- Kitchen Hood

The existing kitchen exhaust systemhas a basic on/off operation. This results in the system
operating during times when it doesn’t need to be operating and conditioned air is
exhausted. This measure is for installing a Captive Aire unit with VFD drives on make-up air
and exhaust fans. A temperature sensor will be installed in the duct work and control
operation based on the temperature inside the duct.