Board Of Aldermen - Agenda - 9/22/2020 - P123
Attachment 8 — Standards of Comfort
ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019
Attachment 8 — Standards of Comfort
ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019
Attachment 7 - Additional Construction or Operational Requirements
The customer will be required to provide the ESCO access to the work site during normal
business hours. Some of the work activities may require the Customer to work around the
contractors performing the work. Scheduling and coordination of construction activities will
take place on a weekly basis to avoid unnecessary delay or disruptions to the contractors
work and that of the Customer. Owner must maintain equipment per manufacturer’s
requirements.
Attachment 6 — Scope of Work and Project Schedule
For scope of work refer to IGA
Note all work is anticipated to by completed in November 2021. EEI
and Nashua School District will coordinate access to building spaces
for work completion.
ESCO Contract — Nashua Schools & EEI, Inc 11/22/2019
Attachment 5 - Major Equipment List (Bill of Materials)
ENERGY EFFICIENT INVESTMENTS INC.
Appendix B— Standards of Comfort
EEI, Inc. .
Nashua School District
Occupied WT tery E-Le) = satel etal] 3) [1] i
Building rt) aie} Tiere tae acl | “Cooling Setpoint °F Cooling
Nashua High School North
Classrooms 68 60 72 80
Media Center 68 60 72 80
Cafeteria/Kitchen 68 60 72 a0
Auditorium 68 60 72 80
Offices 68 60 72 80
Gym 68 60 72 80
Library ‘68 60 ¥2 80
Hallways 68 60 f2 80
Nashua High School South
Classrooms 68 60 72 80
ENERGY EFFICIENT INVESTMENTS INC.
| oI
Appendix A - Utility Bills provided by School District
Utility Bills may be provided upon request.
21
| oI
ENERGY EFFICIENT INVESTMENTS INC.
Conditional Savings Guarantee
1. Windows and doors must remain closed all the time during the heating season and all window a/c units
must be removed prior to the beginning of the heating season as described below.
ENERGY EFFICIENT INVESTMENTS INC.
Nashua High School South Total Weather Normalized Annual Energy Costs
$800,000
$700,000
$600,000
$500,000
$400,000
$300,000
$200,000
$100,000
a 2016-2018 AVG Baseline
@ Natural Gas $141,589
@ Electricity $558,762
Nashua High School North Total Weather Normalized Annual Energy Costs
$800,000
$700,000
$600,000
$500,000
$400,000
$300,000
$200,000
$100,000
5-
ENERGY EFFICIENT INVESTMENTS INC.
| oI
Baseline Development and Performance Period
EEI has developed a baseline energy consumption model using 2016 historical energy use data as well
Heating Degree Day (HDD) and Cooling Degree Day (CDD) weather data for the same time period. This
model will be used to compare future actual energy consumption to the baseline weather normalized value.
| oI
ENERGY EFFICIENT INVESTMENTS INC.
6. RATE DATA INFORMATION
The fuel rate values are based on Contract Rates listed as such; $0.15/kWh, $1.00/therm. In using
these contract rates, variation and volatility within the energy markets is eliminated.
7, OPERATIONS, PREVENTATIVE MAINTENANCE, REPAIR AND REPLACEMENT
REQUIREMENTS
Customer will report on all maintenance work completed annually and will continue to maintain
records and make these records available to EEI upon request.
17