Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Board Of Aldermen - Agenda - 1/25/2021 - P2

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/25/2021 - P2

R-21-106

AUTHORIZING THE MAYOR AND CITY TREASURER TO ISSUE BONDS NOT TO
EXCEED THE AMOUNT OF TWO MILLION SEVEN HUNDRED THOUSAND DOLLARS
($2,700,000) FOR VARIOUS IMPROVEMENTS AT THE SOLID WASTE DEPARTMENT

FOUR HILLS LANDFILL AND THE PURCHASE OF TWO REFUSE TRUCKS

Testimony in Favor

Testimony in Opposition

Testimony in Favor

Testimony in Opposition

R-21-107

Board Of Aldermen - Agenda - 1/25/2021 - P1

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/25/2021 - P1

SPECIAL BOARD OF ALDERMEN
JANUARY 25, 2021

7:00 PM

To access Zoom:
https ://usO2web.zoom.us/j/84153208823?pwd=RIZz73Z,.NczV RNkRhT Irb 05aO X BPUT 09

Meeting ID: 8415320 8823 Passcode: 071918

To join by phone: 1-929-205-6099 - Meeting!D: 8415320 8823 Passcode: 071918

If for some reason you cannot connect to Zoom, please contact us at (603) 821-2049 and they will help you
with connectivity. The public may also view the meeting via Channel 16.

PRESIDENT LORI WILSHIRE CALLS ASSEMBLY TO ORDER

Board Of Aldermen - Agenda - 1/26/2021 - P43

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P43

LEGISLATIVE YEAR 2021
ORDINANCE: 0-21-045

PURPOSE: Amending the building construction ordinances and increasing
the building department fees

ENDORSER(S): Mayor Jim Donchess

COMMITTEE

ASSIGNMENT: Personnel/Administrative Affairs Committee

FISCAL NOTE: Increased fees will result in additional general fund revenues.
ANALYSIS

Board Of Aldermen - Agenda - 1/26/2021 - P42

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P42

ORDINANCE

(f)
(g)

(h)

O-21-045
Irrigation system (includes backflow preventer): $45--$20.
Backflow preventer (each):
[1] Atmospheric vacuum breakers: $44-$16.
[2] Pressure vacuum breakers: $14-$16.
[3] Dual check valve: $14-$16.
[4] Reduced-pressure principle: $44-$16.
Water pipes: (per 100 feet or part thereof}: $45-$18.
Sanitary sewer and storm drain connection or repair of: $45-$18.

Drainage, waste and vent pipes: (per 100 feet or part thereof): $415-
518.

(kK)

(aj())

Board Of Aldermen - Agenda - 1/26/2021 - P41

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P41

ORDINANCE

O-21-045

D. Plumbing permit fee schedule.

(1)

(2)

Residential plumbing (one- and two-family and townhouses).

(a)
(b)

Nonrefundable application processing and review fee: $30-$50.

Per fixture or fixture connection (tub, shower, sink, water closet,
lavatory, dishwasher, outside faucet, clothes-washing machine,
backflow preventer, etc.): $450-$9,50.

| —Tevigat aeludes bacle! $19

{8c}
€e)(d)
(e)
tof)
ay{2)

@)(h)

oO)

9)

Board Of Aldermen - Agenda - 1/26/2021 - P40

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P40

ORDINANCE

(g)
(h)

@)
(k)
()
(m)

(n)

(0)

(p}

(q)

()

O-21-045
Track lighting (each 10 feet): $6-$8.

Motor control centers (each), automatic transfer switches Ceach),
wiring of HVAC units (per unit): $32-$35.

Water heaters (each): $12-$15.

Electric baseboard heat (per unit): $8-$10.

Buss ducts (each section): $40-$15.

Transformers, generators, motors, x-ray machines (each): $22-$25
Paging and sound systems:

[1] Per speaker: $3-35.

Board Of Aldermen - Agenda - 1/26/2021 - P39

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P39

ORDINANCE

(2)

O-21-045

(f) Adding or relocating meter(s): $50-$55.

(g) Pools (in-ground): $58-$60.

(h) | Temporary service (each): $45-$50.

(i) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section:
$35-$40.

(i) Low voltage wiring (per square feet of work area): $0,080.

(kK) Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Board Of Aldermen - Agenda - 1/26/2021 - P38

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P38

ORDINANCE O-21-045

(d) Chimney or chimney liner (masonry or metal): $45. $90.

A(e) Fans: $25.$30.

)(f) Kitchen exhaust systems:

[1] Hoods and exhaust fans (each): $75-390.

(4}(g) Minimum fee for miscellaneous equipment (each), excluding the
application and review fee, where not otherwise provided for by
this section: $35. $45.

&)(h) Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Board Of Aldermen - Agenda - 1/26/2021 - P37

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P37

ORDINANCE

(2)

O-21-045

thi(g) Minimum fee for miscellaneous equipment (each), excluding the

(hb)

aw

application fee, where not otherwise provided for by this section:
$35-$40.

Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Surcharge for permits issued after construction started without a
permit: 100% of applicable fee, but not to exceed $275.

Commercial mechanical (including multifamily).

Board Of Aldermen - Agenda - 1/26/2021 - P36

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 1/26/2021 - P36

ORDINANCE

(c)

(d)

Q-21-045

[1] Gas supply piping (base fee downstream of meter or
regulator set; test witnessed)-eaeh}: $0.30 per 1,000 BTUs.

34/2] Installation of fuel oil or propane storage tanks less than
499 gallons, fuel oil (each): $45- $30.

[3] Dormant Gas meter $45.

Equipment:

[i] Furnace, HRV/ERV., boiler or water heater: $49; $45.
[2] Water heater: $15-Generator including gas piping: $45.

[3]

>

$15-Ductless split system: $40.

Pagination

  • Previous page ‹‹
  • Page 2271
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact