Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Board Of Aldermen - Agenda - 3/1/2021 - P21

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P21

ORDINANCE

(f)
(g)

(h)

O-21-045
Irrigation system (includes backflow preventer): $45--$20.
Backflow preventer (each):
[1] Atmospheric vacuum breakers: $44-$16.
[2] Pressure vacuum breakers: $14-$16.
[3] Dual check valve: $14-$16.
[4] Reduced-pressure principle: $44-$16.
Water pipes: (per 100 feet or part thereof}: $45-$18.
Sanitary sewer and storm drain connection or repair of: $45-$18.

Drainage, waste and vent pipes: (per 100 feet or part thereof): $415-
518.

(kK)

(aj())

Board Of Aldermen - Agenda - 3/1/2021 - P20

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P20

ORDINANCE

O-21-045

D. Plumbing permit fee schedule.

(1)

(2)

Residential plumbing (one- and two-family and townhouses).

(a)
(b)

Nonrefundable application processing and review fee: $30-$50.

Per fixture or fixture connection (tub, shower, sink, water closet,
lavatory, dishwasher, outside faucet, clothes-washing machine,
backflow preventer, etc.): $450-$9,50.

| —Tevigat aeludes bacle! $19

{8c}
€e)(d)
(e)
tof)
ay{2)

@)(h)

oO)

9)

Board Of Aldermen - Agenda - 3/1/2021 - P19

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P19

ORDINANCE

(g)
(h)

@)
(k)
()
(m)

(n)

(0)

(p}

(q)

()

O-21-045
Track lighting (each 10 feet): $6-$8.

Motor control centers (each), automatic transfer switches Ceach),
wiring of HVAC units (per unit): $32-$35.

Water heaters (each): $12-$15.

Electric baseboard heat (per unit): $8-$10.

Buss ducts (each section): $40-$15.

Transformers, generators, motors, x-ray machines (each): $22-$25
Paging and sound systems:

[1] Per speaker: $3-35.

Board Of Aldermen - Agenda - 3/1/2021 - P18

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P18

ORDINANCE

(2)

O-21-045

(f) Adding or relocating meter(s): $50-$55.

(g) Pools (in-ground): $58-$60.

(h) | Temporary service (each): $45-$50.

(i) Minimum fee for miscellaneous equipment (each), excluding the
application fee, where not otherwise provided for by this section:
$35-$40.

(i) Low voltage wiring (per square feet of work area): $0,080.

(kK) Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Board Of Aldermen - Agenda - 3/1/2021 - P17

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P17

ORDINANCE O-21-045

(d) Chimney or chimney liner (masonry or metal): $45. $90.

A(e) Fans: $25.$30.

)(f) Kitchen exhaust systems:

[1] Hoods and exhaust fans (each): $75-390.

(4}(g) Minimum fee for miscellaneous equipment (each), excluding the
application and review fee, where not otherwise provided for by
this section: $35. $45.

&)(h) Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Board Of Aldermen - Agenda - 3/1/2021 - P16

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P16

ORDINANCE

(2)

O-21-045

thi(g) Minimum fee for miscellaneous equipment (each), excluding the

(hb)

aw

application fee, where not otherwise provided for by this section:
$35-$40.

Reinspection of the same work due to the failure to pass an initial
inspection or the unavailability of the premises at the time of initial
inspection: $75.

Surcharge for permits issued after construction started without a
permit: 100% of applicable fee, but not to exceed $275.

Commercial mechanical (including multifamily).

Board Of Aldermen - Agenda - 3/1/2021 - P15

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P15

ORDINANCE

(c)

(d)

Q-21-045

[1] Gas supply piping (base fee downstream of meter or
regulator set; test witnessed)-eaeh}: $0.30 per 1,000 BTUs.

34/2] Installation of fuel oil or propane storage tanks less than
499 gallons, fuel oil (each): $45- $30.

[3] Dormant Gas meter $45.

Equipment:

[i] Furnace, HRV/ERV., boiler or water heater: $49; $45.
[2] Water heater: $15-Generator including gas piping: $45.

[3]

>

$15-Ductless split system: $40.

Board Of Aldermen - Agenda - 3/1/2021 - P14

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P14

ORDINANCE

(8)
(9)

(10)

(14)

(12)

(13)

(14)

(15)

O-21-045

Certificate of Occupancy, existing space/owner change: $50.

Board Of Aldermen - Agenda - 3/1/2021 - P13

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P13

ORDINANCE

O-21-045

§ 105-2228. Fee Schedule.

A. Building permit fee schedule.

()

(2)

(3)

(4)

6)

(6)
(7)

A nonrefundable application processing and review fee shall be paid at the
time of filing of any application:

(a) Building permit: $33-$50

Board Of Aldermen - Agenda - 3/1/2021 - P12

By dnadmin on Mon, 11/07/2022 - 06:58
  • Read more about Board Of Aldermen - Agenda - 3/1/2021 - P12

ORDINANCE O-21-045
D. Delete Section 105.6.3
E. Amend Section 107.4 by adding the following statement:

In place of the insertions in the model code text, it shall be clearly understood that
all violations of the adopted codes of the City of Nashua shall be subject to the
provisions of NRO Chapter 74 and NH RSA 676:15-17-b, without limitation of
any remedy available to the City of Nashua at law or equity.

Pagination

  • Previous page ‹‹
  • Page 2256
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact