Board Of Aldermen - Agenda - 3/23/2021 - P107
Master Plan Nashua Fire Rescue, NH
Master Plan Nashua Fire Rescue, NH
Master Plan Nashua Fire Rescue, NH
Section IV. Analysis of Service Delivery and Performance
Master Plan Nashua Fire Rescue, NH
Figure 63. Nashua Fire Rescue’s Boat and Support Asset Inventory
Scheduled Replacement Fi
SC)
Boat/Water Craft
2011 Rescue One Boat 2023 14,062 Marine One (B01)
2011 Zodiac Boat 2020 6,524 Marine Two
Support Assets
Master Plan
Figure 62. Nashua Fire Rescue’s Staff and Utility Vehicles
Nashua Fire Rescue, NH
Scheduled Replacement
2020
2018
2018
2018
2015
2015
2016
2014
2013
2013
2012
2009
2006
2004
Ford
Ford
Ford
Ford
Ford
Ford
Ford
Ford
Ford
Ford
Chevy
Ford
Ford
International
Master Plan Nashua Fire Rescue, NH
These examples are presented as a “total picture” approach to determining an apparatus’s operational
status, as opposed to simply replacing a unit based upon an arbitrary number that may or may not apply to
the department. Should Nashua Fire Rescue's leadership establish a similar model, it must be understood
that the entire fleet should be updated annually.
Master Plan Nashua Fire Rescue, NH
Master Plan Nashua Fire Rescue, NH
Master Plan Nashua Fire Rescue, NH
alt= 5 Date of Apparatus sas
s Engine 5
Rel CFR-1
5 101 Pine Hill Road 1961 Fair
Reserve Engine 8
Engine 6
Utility 1
Reserve Engine 7
6 2 Conant Road 1971 Fair
2 Mechanic's
Trucks
Utility Pickup
een Bucket Truck
neaeecariets 38 Lake Street 1901 Staff Pickup Good
Wire Trailer
Training . .
Facility Four Hills Landfill 2017 Excellent
Master Plan
ESC)
Emergency Services
Consulting International
Nashua Fire Rescue, NH
Figure 60. Nashua Fire Stations and Facilities
alt= 5 Date of Apparatus sas
15 Amherst Street
177 Lake Street
124 Spit Brook Road
70 East Hollis Street
Engine 1
Ladder 1
Forestry 1
1893 Fair
Marine 1
Marine 2
Engine 2
Ladder 2
Special Hazards 1
Dive Truck
Confined Space
Trailer
1998 2 Training/Safety Good
Vehicles
Master Plan Nashua Fire Rescue, NH
Figure 59. Fire Station Condition Classifications
Like new condition. No visible structural defects. The facility is clean and well
maintained. Interior layout is conducive to function with no unnecessary
See impediments to the apparatus bays or offices. No significant defect history. Building
design and construction match the building's purposes. Age is typically less than
10 years.