ITEM 417.20- COLD PLANING TRANSITIONS
A. SCOPE

This work shall consist of the removal of existing bituminous pavement the depth and limits
shown on the plans or as directed by the Engineer. Cold planning transitions are required to tie in
overlays with existing pavement.

For roadways which are being reclaimed this item shall only be used to pay for cold planing at
driveway tie-ins as directed by the Engineer.

Board Of Aldermen - Agenda - 3/23/2021 - P206

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P206

C. MEASUREMENT AND PAYMENT
This item shall be measured by the Square Yard of Cold Planing of Bituminous Surfaces.

Payment for this item shall be at the contract unit price per Square Yard. This payment shall also
include all materials, labor, equipment, and all else needed to complete the work under this item.

Contractor shall record the square yards of cold planed area for each street. Payment is
contingent upon submittal of quantities in a per street format.

Board Of Aldermen - Agenda - 3/23/2021 - P205

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P205

ITEM 417 - COLD PLANING OF BITUMINOUS SURFACES
A. SCOPE

This work shall consist of the removal of existing bituminous pavement between road edges, to
the depth shown on the plans or as ordered by the Engineer. Maximum depth will vary from 1.5”
to 2”, depending upon the specific street treatment.

B. MATERIALS AND CONSTRUCTION

Board Of Aldermen - Agenda - 3/23/2021 - P204

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P204

ITEM 403.6 - PAVEMENT JOINT ADHESIVE
A. SCOPE

This work includes the installation of pavement joint adhesive in locations as specified herein,
shown on the plans or as directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

Board Of Aldermen - Agenda - 3/23/2021 - P203

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P203

ITEM 403.12 -HOT BITUMINOUS PAVEMENT, HAND METHOD
A. SCOPE

This work shall include paving using the hand method for driveways, curb patches, areas
between railroad crossings, areas where it is impractical to pave using machine method, as
shown on the plans, or as ordered by the Engineer. Hand method paving shall not be used where
machine method paving is required.

B. MATERIALS AND CONSTRUCTION

Board Of Aldermen - Agenda - 3/23/2021 - P202

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P202

This required minimum asphalt content is based on the use of aggregate with a specific gravity of
2.65 to 2.70. The minimum asphalt content requirement may be adjusted when aggregate with a
higher specific gravity is used, or the minimum may be adjusted at the Engineer’s discretion if it
is believed to be in the best interest of the Department.

Hot Bituminous Pavement to be placed under NHDOT Section 401 “Method Requirements” (not
“QC/QA”).

Board Of Aldermen - Agenda - 3/23/2021 - P201

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P201

ITEM 403.11 - HOT BITUMINOUS PAVEMENT (METHOD
SPECIFICATION), MACHINE METHOD

A. SCOPE

This work shall consist of furnishing and placing bituminous pavement to the depth shown on
the plans or ordered by the Engineer. Work shall also include obtaining asphalt samples and
asphalt cores on behalf of the City for quality control testing.

B. MATERIALS AND CONSTRUCTION

Board Of Aldermen - Agenda - 3/23/2021 - P200

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P200

C. MEASUREMENT AND PAYMENT

This item shall be measured by the Square Yard of Reclaimed Stabilized Base Processed in
Place, 12” Deep. Payment for this item shall be at the contract unit price per Square Yard. This
payment shall also include all materials, labor, equipment, and all else needed to complete the
work under this item.

Contractor shall record the square yard of reclaimed area for each street. Payment is contingent
upon submittal of quantities in a per street format.

Page 5 of 42

Board Of Aldermen - Agenda - 3/23/2021 - P199

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P199

ITEM 306.112 - RECLAIMED STABILIZED BASE PROCESSED IN
PLACE, 12” DEEP

A. SCOPE

Board Of Aldermen - Agenda - 3/23/2021 - P198

By dnadmin on Mon, 11/07/2022 - 07:05
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P198

ITEM 304.32 -CRUSHED GRAVEL FOR SHOULDER LEVELING
A. SCOPE

This work shall consist of furnishing and placing crushed aggregate to raise the edge of the
roadway shoulders as shown on plans or directed by the Engineer.

B. MATERIALS AND CONSTRUCTION