Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Board Of Aldermen - Agenda - 3/23/2021 - P427

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P427

C. MEASUREMENT AND PAYMENT

Board Of Aldermen - Agenda - 3/23/2021 - P426

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P426

ITEM 619.1 - MAINTENANCE OF TRAFFIC
A. SCOPE

Board Of Aldermen - Agenda - 3/23/2021 - P425

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P425

ITEM 618.7 - FLAGGERS
A. SCOPE

This work shall consist of furnishing qualified flaggers, as required to direct traffic through or
around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified flaggers as per the latest approved NHDOT Standard
Specifications for Road and Bridge Construction. Daily coverage needs to be approved by the
Engineer.

C. MEASUREMENT AND PAYMENT

Board Of Aldermen - Agenda - 3/23/2021 - P424

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P424

ITEM 618.6 - UNIFORMED OFFICERS
A. SCOPE

This work shall consist of furnishing uniformed officers, with or without vehicles, as required to
direct traffic through or around the Work as ordered by the Engineer.

B. MATERIALS AND CONSTRUCTION

The Contractor shall supply qualified uniformed officers as per the latest approved NHDOT
Standard Specifications for Road Construction. Uniformed officers shall only be used when the
Engineer has previously approved it. Daily coverage needs to be approved by the Engineer.

Board Of Aldermen - Agenda - 3/23/2021 - P423

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P423

ITEM 616.7 - LOCAL TRAFFIC LOOPS 6’ X 50’ (2-4-2 TURN)

A. SCOPE

This work consists of furnishing all labor, materials and equipment necessary to install the
quadruple loop detectors as directed by the Engineer.

B. MATERIALS AND CONSTRUCTION

This item shall include all labor, materials and equipment necessary to install new quadruple
loop detectors 2-4-2 turn, in conjunction with the paving program. Loops shall be installed in the
pavement surface prior to final overlay or top course.

Board Of Aldermen - Agenda - 3/23/2021 - P422

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P422

ITEM 616.191 — ALTERATION OF TRAFFIC SIGNALS — 360 DEGREE
TRAFFIC CAMERAS

A. SCOPE

This work shall include the labor and material for the installation of a GRIDSMART Video
Detection System. The GRIDSMART Video Detection System shall include GS2 Processor, 360
Degree Camera, Mounting Hardware, Data Module, Surge Protection, and CatSe Underground
Shielded Wire, and any additional hardware or software required for a complete installation in
accordance with manufacturer recommendations.

B. MEASUREMENT AND PAYMENT

Board Of Aldermen - Agenda - 3/23/2021 - P421

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P421

ITEM 615.06 — TRAFFIC SIGN TYPE CC

A.

SCOPE

This work shall consist of furnishing and erecting regulatory and warning traffic signs
shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for installing
traffic signs, and all necessary mounting hardware in accordance with relevant provisions
of Section 615 of the NHDOT Standard Specifications, latest edition.

MEASUREMENT AND PAYMENT

Board Of Aldermen - Agenda - 3/23/2021 - P420

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P420

ITEM 615.033 - REMOVING TRAFFIC SIGN, TYPE C

A.

SCOPE

This work shall consist of removing existing regulatory, warning, and directional traffic
signs and sign supports as shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for removing
traffic signs, including posts, foundations, bases and all necessary mounting hardware in
accordance with relevant provisions of Section 615 of the NHDOT Standard
Specifications, latest edition.

Board Of Aldermen - Agenda - 3/23/2021 - P419

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P419

ITEM 615.03 — TRAFFIC SIGN TYPE C

A.

SCOPE

This work shall consist of furnishing and erecting regulatory and warning traffic signs
and sign supports as shown on the plans or as ordered by the Engineer.

MATERIALS AND CONSTRUCTION

The Contractor shall furnish all materials, labor and equipment necessary for installing
traffic signs, including new posts, foundations, bases and all necessary mounting
hardware in accordance with relevant provisions of Section 615 of the NHDOT Standard
Specifications, latest edition.

Board Of Aldermen - Agenda - 3/23/2021 - P418

By dnadmin on Mon, 11/07/2022 - 07:06
  • Read more about Board Of Aldermen - Agenda - 3/23/2021 - P418

ITEM 609.811 —- BITUMINOUS CURBING

A. SCOPE

This work shall consist of constructing bituminous curbs as shown on the plans or as ordered by
the Engineer. Work includes all furnishing, placing, and cleanup work associated with the
installation of the curbing.

B. MATERIALS AND CONSTRUCTION

Pagination

  • Previous page ‹‹
  • Page 2094
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact