Board Of Aldermen - Agenda - 8/9/2022 - P65
Segment 2 — Path and Riverbank Enhancements
2.1 TTG will perform additional river normal and flood analyses to evaluate the flood
resiliency of Tighe & Bond’s riverbank protection system(s) and modifications to the
park and boardwalk alignment to avoid conflicts with the Eversource substation,
Segment 3 — Substation Screening
3.1 TTG will perform final and structural design for the metal screening structure based
on Payette Architect’s March 6, 2022 design.