Board Of Aldermen - Agenda - 6/14/2022 - P90
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
:603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
Estimated Direct Costs
TOTAL ESTIMATED COST =
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
:603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
Estimated Direct Costs
TOTAL ESTIMATED COST =
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
t 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 63301
t: 603,228,1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
SSS EEE ——,
27 Locke Road Concord, NH 03301
: 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301 = t: 603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
The H.L. Turner Group Inc.
27 Locke Road Concord, NH 03301
:603.228.1122 hiturner.com
Nashua Riverfront Development Project
Final Engineering Design
“Bas
Attachment A
Fee Summary Sheet
ic’ and “Additional” Services
Final Engineering Design
Item Fees
1. Basic Design ServiceS........ccssserssseccsssersseesssisereseriseeneneeteseonsscesreeeensestaee ..5286,340.00
2. Additional Services:
Al Geotechnical Analyses & Recommendation. ......cscccsseseesseceesees §$ 75,000.00
A.2 —_ Spot Field SUrVEYS......cscescressssssesreersessstsstesserentesstersesssetserteeenertts § 12,000.00
A3 Project Progress Meetings.........cccccsssscecsesnssseeseeesnarssensenseneees § 16,000.00
Attachment A
Fee Summary Sheet
CONTRACT FORM
Please sign and return these originals as your acceptance of the above scope and terms,
including noted attachments, and your authorization to proceed. Please also provide a
purchase order or equivalent accounting number, if applicable, at the end of this letter in
order to allow us to proceed.
CLIENT RESPONSIBILITIES
Final Engineering Design Proposal 65-11-22
4920
Owner/Contractor contract documents (except technical documents) and/or
purchase order, in order to solicit for and enter into a construction contract with a
Contractor or Construction Manager.
Solicit, administer, and award bids for construction implementation of this project.
Provide construction administration and supervisions of Contractor or Construction
Manager.