Owner’s schedule or budget for Cost of the Work, or bid packages in addition to those listed in
Section 1.1.6;
Owner’s schedule or budget for Cost of the Work, or bid packages in addition to those listed in
Section 1.1.6;
Services Responsibility Location of Service Description
(Architect, Owner | (Section 4.2 below or in an exhibit
or attached to this document and
Not id below
184.44 Assistance with selection ofthe sss] ATCIIGOINUES! | Pa eee | { Deleted: )
Construction
44.2 Programming sd COI | ee ee | . PM
a a { Deleted: (B202™-2009) }
414 Measured
4Ad facilities
§ 4.1.6 Site Evaluation and Planning (B2037™_
specify the appropriate performance and design criteria that such services must satisfy. The Architect shall review
shop drawings and other submittals related to the Work designed or certified by the design professional retained by
the Construction Manager that bear such professional’s seal and signature when submitted to the Architect. The
Architect shall be entitled to rely upon the adequacy, accuracy and completeness of the services, certifications and
approvals performed or provided by such design professionals.
either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the Architect to the
Construction Manager, Subcontractors, material and equipment suppliers, their agents or employees or other persons
or entities performing portions of the Work.
and other requirements for the construction of the Work. The Owner and Architect acknowledge that in order to
construct the Work the Construction Manager will provide additional information, including Shop Drawings,
Product Data, Samples and other similar submittals, which the Architect shall review in acc
3.6.4.
§ 3.5.2 The Architect shall incorporate into the Construction Documents the design requirenrents
authorities having jurisdiction over the Project.
§ 3.3.5 Based on the Owner’s approval of the preliminary design, the Architect shall prepare Schematic Design
Documents for the Owner’s approval and the Construction Manager’s review. The Schematic Design Documents
shall consist of drawings and other documents including a site plan, if appropriate, and preliminary building plans,
sections and elevations; and may include some combination of study models, perspective sketches, or digital
modeling. Preliminary selections of major building systems and construction materials shall be noted on the
§ 3.1.4 The Architect shall submit information to the Construction Manager and participate in developing and
revising the Project schedule as it relates to the Architect’s services. The Architect shall review and approve, or take
other appropriate action upon, the portion of the Project schedule relating to the performance of the Architect’s
services.
§ 3.1.5 Once the Owner, Construction Manager, and Architect agree to the time limits established by the Project
schedule, the Owner and Architect shall not exceed them, except for reasonable cause.
§ 2.6 Insurance, The Architect shall maintain the following insurance for the duration of this Agreement. If any of
the requirements set forth below exceed the types and limits the Architect normally maintai
reimburse the Architect for any additional cost as set forth in Section 11.8.3.
with polic limits of not less than &
§ 2.6.1 Commercial General Liabili not le
Worl pe GOUOU) i
for each occurrence and
damage.
required automobile cover age.
§ 1.1.12.1 Consultants retained under Basic Services:
-1 Structural Engineer:
. i
3 Electrical Engineer:
§ 1.1.12.2 Consultants retained under Additional Services: ca on
§ 1.1.13 Other Initial Information on which the Agreement is based: —— ~
§ 1.2 The Owner and Architect may rely on the Initial Information. Both parties, however, recognize that such :
information may materially change and, in that event, the Owner and the Architect shall appropniately-adyust the a A\
(The Construction Manager is identified on the cover page. If a Construction Manager has not been
retained as of the date of this Agreement, state the anticipated date of retention. If the Architect is to
assist the Owner in selecting the Construction Manager, complete Section 4, 1.1)
2 Cost Consultant (if in addition to the Construction Manager):
(if a Cost Consultant is retained, appropriate references to the Cost Consullant should be inserted in
Sections 3.3.6, 3.3.7, 3.4.2, 3.4.3, 3.5.4, 3.5.5, 5.4, 6.3, 63.1, 64 and 11.6)