Finance Committee - Agenda - 10/4/2017 - P89
WALDRON
37 Industrial Ave.
Exeter, NH 03833
One Penn Plaza,
36"" Floor
New York, NY 10119
Erich Gustenhoven, P.E., Mechanical Engineer
Harvard University — Cambridge, MA
WALDRON
37 Industrial Ave.
Exeter, NH 03833
One Penn Plaza,
36"" Floor
New York, NY 10119
Erich Gustenhoven, P.E., Mechanical Engineer
Harvard University — Cambridge, MA
WALDRON
37 Industrial Ave.
Exeter, NH 03833
One Penn Plaza,
36" Floor
New York, NY 10119
Erich Gustenhoven, P.E., Mechanical Engineer
Background
Mr.Gustenhoven has been in the power industry over five years and has amassed a
depth and breadth of experience that allows him to be a contributor to any type of
project. This includes a significant amount of field work, coupled with detailed
design efforts in the office.
Experience
Tufts University Campus Energy Center Commissioning — Medford, MA
WALDRON
37 Industrial Ave.
Exeter, NH 03833
One Penn Plaza,
36" Floor
New York, NY 10119
Jeremy P. Smith, P.E., Project Manager
Professional Registrations
New Hampshire, Virginia, Connecticut, New York, New Jersey
New Hampshire (Controls), Massachusetts (Controls)
Professional Affiliations
ASME, American Association of Mechanical Engineers
ISA, Instrumentation, Systems And Automation Society
NFPA, National Fire Protection Association
Certifications
WALDRON
37 Industrial Ave.
Exeter, NH 03833
One Penn Plaza,
36" Floor
New York, NY 10119
Jeremy P. Smith, P.E., Project Manager
Utility power project for the Vineland Municipal Electrical Utility. Oversights of Air
permit, site planning, state, and county reviews. Engineering budget for this $70+
million project was $2.2 million
Federal Government
(district heating loop --dynamic response modeling, control component sizing, control
algorithm design, and control logic diagrams)
institutional
WALDRON
37 Industrial Ave.
Exeter, NH 03833
One Penn Plaza,
36" Floor
New York, NY 10119
Jeremy P. Smith, P.E., Project Manager
Industrial Boiler Plant
Harvard University — Cambridge, MA
Managed all aspects of engineering, procurement, and commissioning for a complete
control and BMS retrofit of Boiler 11 (200kpph, 400 psig) and Boiler 6 (L0Okpph,400
psig) , bringing the existing outdated systems into compliance with modern codes and
instrumentation.
WALDRON
37 Industrial Ave.
Exeter, NH 03833
One Penn Plaza,
36" Floor
New York, NY 10119
Jeremy P. Smith, P.E., Project Manager
Background
“oul ‘UOHONASUOD pue BuLeUlbU UOUpleEAA
BUO}S9II|\) SAQOEU|
fy SUIIPESQ ysel Sanoeu|
= ssolbold ySe] sagoeu
c Aluo-ysiuty & BUO}SOH [BUEa]Xy
7 Ajuo-WeyS syse | |eue}xy LUZ/9 PEM carved
Geen ect Arewuwng jenuey| Arewuns yeloig AluQ asoding Jesodod 404 ainpsyys joalold 398[Old
Ses dnyjoy Aewuing jenueyy Asewwng
Aluo-uojeing SUO}SOLIW
[Aen IRT yse{ jenuel| yids
Pe Alewwng aanoeu| yseL
FS “ft BLP/LNUL © SL/PILMUL —-SKepg ayejduio5 uBiseq dH 6e_
. | Be
Creer) SLeILNUL = LWez/@b ud = Shep 2 ubiseg %001 oe
Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services
15. Testing of existing digester gas, electrical and mechanical systems are not included.
The design assumes the digester gas quality complies with engine manufacturer’s
fuel specifications.
16. Geotechnical analysis is by others.
17. WWTF will provide all relevant design drawings for existing facility including site
survey information.
Revised August 28, 2017
WALDRON
Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services
Ciarifications and Exemptions
1.
10.
11.
12.
13.
14.
Waldron’s design scope is based on 2 CAT G3406 200kW Model recip engine
generators and the allotted space is sufficient for the 2 CAT G3406 200kW Model
recip engine generator installation and operation. Design will be based on best
available information, not vendor design submittal, for the engine generator and
switchgear.