Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 10/4/2017 - P89

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P89

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36"" Floor
New York, NY 10119

Erich Gustenhoven, P.E., Mechanical Engineer

Harvard University — Cambridge, MA

Finance Committee - Agenda - 10/4/2017 - P88

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P88

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Erich Gustenhoven, P.E., Mechanical Engineer

Background

Mr.Gustenhoven has been in the power industry over five years and has amassed a
depth and breadth of experience that allows him to be a contributor to any type of
project. This includes a significant amount of field work, coupled with detailed
design efforts in the office.

Experience

Tufts University Campus Energy Center Commissioning — Medford, MA

Finance Committee - Agenda - 10/4/2017 - P87

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P87

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Professional Registrations
New Hampshire, Virginia, Connecticut, New York, New Jersey
New Hampshire (Controls), Massachusetts (Controls)

Professional Affiliations

ASME, American Association of Mechanical Engineers
ISA, Instrumentation, Systems And Automation Society
NFPA, National Fire Protection Association

Certifications

Finance Committee - Agenda - 10/4/2017 - P86

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P86

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Utility power project for the Vineland Municipal Electrical Utility. Oversights of Air
permit, site planning, state, and county reviews. Engineering budget for this $70+
million project was $2.2 million

Federal Government
(district heating loop --dynamic response modeling, control component sizing, control
algorithm design, and control logic diagrams)

institutional

Finance Committee - Agenda - 10/4/2017 - P85

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P85

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Industrial Boiler Plant

Harvard University — Cambridge, MA

Managed all aspects of engineering, procurement, and commissioning for a complete
control and BMS retrofit of Boiler 11 (200kpph, 400 psig) and Boiler 6 (L0Okpph,400
psig) , bringing the existing outdated systems into compliance with modern codes and

instrumentation.

Finance Committee - Agenda - 10/4/2017 - P84

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P84

WALDRON

37 Industrial Ave.
Exeter, NH 03833

One Penn Plaza,
36" Floor
New York, NY 10119

Jeremy P. Smith, P.E., Project Manager

Background

Finance Committee - Agenda - 10/4/2017 - P83

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P83

eyat=y6 a plats)

Finance Committee - Agenda - 10/4/2017 - P82

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P82

“oul ‘UOHONASUOD pue BuLeUlbU UOUpleEAA
BUO}S9II|\) SAQOEU|
fy SUIIPESQ ysel Sanoeu|
= ssolbold ySe] sagoeu
c Aluo-ysiuty & BUO}SOH [BUEa]Xy
7 Ajuo-WeyS syse | |eue}xy LUZ/9 PEM carved
Geen ect Arewuwng jenuey| Arewuns yeloig AluQ asoding Jesodod 404 ainpsyys joalold 398[Old
Ses dnyjoy Aewuing jenueyy Asewwng
Aluo-uojeing SUO}SOLIW
[Aen IRT yse{ jenuel| yids
Pe Alewwng aanoeu| yseL
FS “ft BLP/LNUL © SL/PILMUL —-SKepg ayejduio5 uBiseq dH 6e_
. | Be
Creer) SLeILNUL = LWez/@b ud = Shep 2 ubiseg %001 oe

Finance Committee - Agenda - 10/4/2017 - P81

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P81

Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services

15. Testing of existing digester gas, electrical and mechanical systems are not included.
The design assumes the digester gas quality complies with engine manufacturer’s
fuel specifications.

16. Geotechnical analysis is by others.

17. WWTF will provide all relevant design drawings for existing facility including site
survey information.

Revised August 28, 2017

WALDRON

Finance Committee - Agenda - 10/4/2017 - P80

By dnadmin on Mon, 11/07/2022 - 10:20
  • Read more about Finance Committee - Agenda - 10/4/2017 - P80

Nashua Waste Water Treatment Facility - Energy Recovery Generator Upgrade
Engineering Design Services

Ciarifications and Exemptions

1.

10.

11.

12.
13.

14.

Waldron’s design scope is based on 2 CAT G3406 200kW Model recip engine
generators and the allotted space is sufficient for the 2 CAT G3406 200kW Model
recip engine generator installation and operation. Design will be based on best
available information, not vendor design submittal, for the engine generator and
switchgear.

Pagination

  • Previous page ‹‹
  • Page 1344
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact