Finance Committee - Agenda - 3/17/2021 - P564
90th aahmOnERDNaDSOTES
3
8
EXISTING —_, |
CONCRETE
BLOCK WALL
(HEIGHT
VARIES)
NOTES:
90th aahmOnERDNaDSOTES
3
8
EXISTING —_, |
CONCRETE
BLOCK WALL
(HEIGHT
VARIES)
NOTES:
NOTE:
4. REFER TO SHEET 1 FOR ADDITIONAL NOTES AND LEGEND. START OF EXISTING (©
CONCRETE BLOCK WALL
a —_ = :
_
LEGEND (PROPOSED): a
2 LANDFILL GAS (LFG) CONVEYANCE PIPE SS ~
= (SIZE AND SLOPE DIRECTION) <<) s es A ~ ~
3 Ef LAYER
< -
3
2
2
9 2001 SANDOR, HEAD & ASSDINTES. MB
Z
é
i
5
zg
=o
TO LANDFILL GAS LPs
O ENERGY n=
IT
£
PREPARED FOR:
CONCRETE BLOCK WALL CORRECTIVE ACTION
FOUR HILLS LANDFILL
NASHUA, NEW HAMPSHIRE
DES-SW-SP-95-002
JANUARY 2021
EXHIBIT C
SHEET INDEX
SHEET 1 EXISTING CONDITIONS PLAN
SHEET 2 PROPOSED WEST WALL CORRECTIVE ACTION PLAN
SHEET 3 PROPOSED EAST WALL CORRECTIVE ACTION PLAN
SHEETS 4-6 DETAILS
FROM: USGS TOPOGRAPHIC MAP- NASHUA, NEWHAMPSHIRE (2003)
LOCUS PLAN
SCALE: 1"=1000'
CITY OF NASHUA
FOUR HILLS LANDFILL
NASHUA, NEW HAMPSHIRE
PREPARED BY:
Specification 15212 - Polyvinyl Chloride (PVC) Pipe And Fittings Page 3 of 3
January 2021 3066.21
J. After solvent welding, the pipe shall remain undisturbed until cement has
reached initial set. As a guideline for joint setting time, use 1 hour for ambient
temperatures between 60 and 100°F, or 2 hours when ambient temperature is
between 40 and 60°F.
K. Pipe and pipe fittings shall be selected so that there will be as small a deviation
Specification 15212 - Polyvinyl Chloride (PVC) Pipe And Fittings Page 2 of 3
January 2021 3066.21
PART 3 - EXECUTION
3.1 PVC PIPE HANDLING
A. PVC pipe and pipe fittings shall be handled carefully in loading and unloading.
They shall be lifted by hoists and lowered on skidways in such a manner as to
avoid shock. Derricks, ropes, or other suitable equipment shall be used for
lowering the pipe into well borings. Pipe and pipe fittings shall not be dropped
or dumped.
3.2 PVC PIPE INSTALLATION
SECTION 15212
POLYVINYL CHLORIDE (PVC) PIPE AND FITTINGS
PART 1 - GENERAL
1.1 SCOPE OF WORK
A.
Supply polyvinyl! chloride (PVC) Schedule 80 pipe and fittings as shown on the
Drawings.
1.2 SUBMITTALS
A.
CONTRACTOR shall submit to ENGINEER manufacturer’s technical product data
and installation instructions for PVC pipe and fittings.
PART 2 - PRODUCTS
2.1 PIPE AND FITTINGS
A.
Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances
January 2021
Page 8 of 8
3066.21
ATTACHMENT 1 TO SECTION 15210
PIPE PRESSURE AIR TEST LoG
Project No.:
Project Name:
SANBORN |||] HEAD —
Project Location:
Weather:
Contractor: Test No.:
Sanborn Head Personnel:
Person/Company Performing the Test:
Specification 15210 - High Density Polyethylene (HDPE) Pipe, Fittings, And Appurtenances Page 7 of 8
January 2021
3066.21
3.3
A.
PIPE TESTING
CONTRACTOR shall perform a pneumatic test on solid pipe and fittings greater
than 50 ft in length after placement in the trench, in accordance with the
Manufacturer’s recommendations.
Pipes shall be pressure tested in presence of ENGINEER. Provide a minimum 7
days notice to ENGINEER before performing test.
Pneumatic testing shall be performed as follows: