Finance Committee - Agenda - 7/5/2017 - P49

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P49

{

q

THE CITY OF NASHUA “The Gate City’

Financial Services

Purchasing Department

June 29, 2077
Memo #18-003

TO: MAYOR DONCHESS
FINANCE COMMITTEE

SUBJECT: SIPHON COVERS INSTALLATION — CHANGE ORDER #2 (VALUE: $16,618)
DEPARTMENT: 169 WASTEWATER; FUND: WASTEWATER

Please see the attached communication from Noelle Osborne, Wastewater Department Operations
Supervisor, dated June 22, 2017 for the information related to this purchase.

Finance Committee - Agenda - 7/5/2017 - P48

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P48

Pay Item & Proposal Register

R.M. PIPER, INC.
17025a NASHUA--NASHUA PEDESTRIAN BRIDGE REHAB

“Pay Item
Number

500.03

Description -

TEMPORARY SUPERSTRUCTURE SHORING

Quantity
2.00

UNIT

rena secon
Measure

Unit Price
(current)

Total Price
{current}

$42,590.00

$85,000.00

512,01

PREPARATION FOR CONCRETE REPAIRS CLASS

4.50

Square Yard

$1,000.00

$4,500.00

1512.02
520.01

PREPARATION FOR CONCRETE REPAIRS CLASS

Finance Committee - Agenda - 7/5/2017 - P47

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P47

Pay item and unit:

1001.1 Concrete Repairs, Deck
1001.2 Concrete Repairs, Abutment
1001.2 Concrete Repairs, Curb

Nashua / 16-0186 / 2/15/2017

Square Foot
Square Foot
Linear Foot

Finance Committee - Agenda - 7/5/2017 - P46

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P46

2 of 3
3.5.1 The shoulders may be eliminated and used for traffic.
3.5.2 The speed may be reduced to 30 mph through the work zone.

3.5.3 The westbound left turn lane length may be reduced during the hours between 9 AM
and 3 PM. All westbound travel and turn lanes must be in their existing configuration within
125-feet of the intersection.

Finance Committee - Agenda - 7/5/2017 - P45

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P45

1 of 3

NASHUA

February 15, 2017

SPECIALPROVISION
Item 1001.1 — Concrete Repairs, Deck
Item 1001.2 — Concrete Repairs, Abutment
Item 1001.3 — Concrete Repairs, Curb

Description

1.1 This work shall consist of concrete repairs to the top of the pier 2 cap/deck, the face of the
northern abutment backwall, and the southern curb of the span over US Route 3 as shown in the
contract plans.

Materials

Finance Committee - Agenda - 7/5/2017 - P44

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P44

2 of 2
C. Final Coat: Urethane coating, thickness 2 mils + .5. Color to be charcoal brown.
2.4.2 The paint system shall be applied per the manufacturer’s recommendations.
Method of Measurement
3.1 Metal deck form and structural steel clean and paint will be measured as a unit. A unit will
consist of the materials, equipment, and labor necessary to complete the work, including, but not

limited to, access, cleaning, galvanizing repairs, painting, disposal of removed/waste materials,
and mobilization.

Finance Committee - Agenda - 7/5/2017 - P43

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P43

1 of 2

NASHUA

March 13, 2017

SPECIALPROVISION
Item 1001.5 — Metal Deck Form and Structural Steel Clean and Paint
Description

1.1 This work shall consist of cleaning and galvanizing/painting corroded material from the
galvanized corrugated metal deck forms and painted structural steel within approximately three
feet of the bridge supports as directed by and to the satisfaction of the engineer.

Construction

Finance Committee - Agenda - 7/5/2017 - P42

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P42

2 of 2

5.1.1 All costs for mobilization to complete approach repairs shall be included in each
item as needed.

Pay item and unit:

1001.4 Approach Repairs Unit

Nashua / 16-0186 / 2/15/2017

Finance Committee - Agenda - 7/5/2017 - P41

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P41

1 of 2

NASHUA

February 15, 2017

SPECIALPROVISION
Item 1001.4 — Approach Repairs
Description

1.1 This work shall consist of pavement and subbase removal, grading, and paving the northern
approach as shown in the contract plans.

Materials

2.1 Subbase material shall be crushed gravel conforming to the requirements of Item 304.3 of
the NHDOT Standard Specifications.

2.2 Bituminous sidewalk shall conform to the requirements of Item 608.13 of the NHDOT
Standard Specifications.

Construction Requirements

Finance Committee - Agenda - 7/5/2017 - P40

By dnadmin on Mon, 11/07/2022 - 10:22
  • Read more about Finance Committee - Agenda - 7/5/2017 - P40

1 of 1

NASHUA

March 17, 2017

SPECIALPROVISION
AMENDMENT TO SECTION 544 — REINFORCEMENT FOR CONCRETE
Item 544.101 — Reinforcing Steel