Finance Committee - Agenda - 6/7/2017 - P167

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P167

C. If the proper execution or results of any part of CONTRACTOR’s Work depends upon work performed by
others under this Article 7, CONTRACTOR shall inspect such other work and promptly report to ENGINEER in
writing any delays, defects, or deficiencies in such other work that render it unavailable or unsuitable for the
proper execution and results of CONTRACTOR’s Work. CONTRACTOR’s failure to so report will constitute
an acceptance of such other work as fit and proper for integration with CONTRACTOR’s Work except for latent

Finance Committee - Agenda - 6/7/2017 - P166

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P166

6.20 Indemnification

Finance Committee - Agenda - 6/7/2017 - P165

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P165

approval by ENGINEER relieve CONTRACTOR from responsibility for complying with the requirements of
paragraph 6.17.D.1.

F. Resubmittal Procedures
1. CONTRACTOR shall make corrections required by ENGINEER and shall return the required number of
corrected copies of Shop Drawings and submit as required new Samples for review and approval.

CONTRACTOR shall direct specific attention in writing to revisions other than the corrections called for by
ENGINEER on previous submittals.

6.18 Continuing the Work

Finance Committee - Agenda - 6/7/2017 - P164

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P164

ENGINEER may require to enable ENGINEER to review the submittal for the limited purposes required by
paragraph 6.17.E. The numbers of each Sample to be submitted will be as specified in the Specifications.

C. Where a Shop Drawing or Sample is required by the Contract Documents or the schedule of Shop Drawings
and Sample submittals acceptable to ENGINEER as required by paragraph 2.07, any related Work performed
prior to ENGINEER’s review and approval of the pertinent submittal will be at the sole expense and
responsibility of CONTRACTOR.

Finance Committee - Agenda - 6/7/2017 - P163

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P163

E. Protection of Utilities: The CONTRACTOR shall verify all utility locations prior to the start of construction.
This shall include, but not necessarily limited to: irrigation and drainage ditches, culverts, water lines, sewer
lines, telephone cables, cable television, gas lines and electric lines. Prior to the start of construction the
CONTRACTOR shall call Dig Safe System, Inc. 1-800-344-7233 (two full working days’ notice required). The
failure of any utility to subscribe to DIGS shall not relieve the CONTRACTOR from the responsibility of

Finance Committee - Agenda - 6/7/2017 - P162

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P162

8. All changes or modifications which result from the final inspection.

The As-built marked prints shall be delivered to the ENGINEER at the time of final inspection for ENGINEER's
review and approval. All approval and acceptance of As-built drawings shall be accomplished before final
payment is made to the CONTRACTOR.

6.13 Safety and Protection

Finance Committee - Agenda - 6/7/2017 - P161

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P161

D. Loading Structures:

CONTRACTOR shall not load nor permit any part of any structure to be loaded in any manner that will
endanger the structure, nor shall CONTRACTOR subject any part of the Work or adjacent property to stresses
or pressures that will endanger it.

Finance Committee - Agenda - 6/7/2017 - P160

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P160

(i) The subcontractor, after having a reasonable opportunity, fails or refuses to execute a
written contract with the CONTRACTOR which was offered to the subcontractor with the
same terms that all other subcontractors on the project were offered:

(ii) The named subcontractor files for bankruptcy or becomes insolvent; or

(iii) The named subcontractor fails or refuses to perform his subcontract within a reasonable
time or is unable to furnish a performance bond and payment bond.

Finance Committee - Agenda - 6/7/2017 - P159

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P159

G. Workers’ Compensation Coverage.

1. CONTRACTOR agrees as a precondition to the performance of any work under this contract and as a
precondition to any obligation of the OWNER to make any payment under this contract to provide the
OWNER with a certificate of a qualified insurer. CONTRACTOR agrees that notice of any lapse in
coverage or nonpayment of coverage that the CONTRACTOR is required to maintain should be mailed to:

Risk Management
City of Nashua
229 Main Street

Nashua, NH 03060

Finance Committee - Agenda - 6/7/2017 - P158

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P158

Effective date of the Agreement. CONTRACTOR shall pay all charges of utility owners for connections to the
Work, and OWNER shall pay all charges of such utility Owner’s for capital costs related thereto, such as plant
investment fees.

6.09 Laws and Regulations