Skip to main content

Main navigation

  • Documents
  • Search

User account menu

  • Log in
Home
Nashua City Data

Breadcrumb

  1. Home
  2. Agenda

Agenda

Finance Committee - Agenda - 6/7/2017 - P297

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P297

16010-9
ELECTRICAL - GENERAL

c. Index Sheet - Listing the equipment being submitted utilizing equipment
designations, or symbols, indicated on the Contract Documents together
with the proposed manufacturer, style/ type and catalog number.

d. Manufacturer's scale or dimensioned drawings along with standard catalog
"cut" sheets. These cut sheets shall be marked up to indicate equipment,
sizes, types, etc., of equipment and all options being provided.

e. Equipment ratings, service clearances and configuration.

Finance Committee - Agenda - 6/7/2017 - P296

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P296

16010-8
ELECTRICAL - GENERAL

submit a proposed substitution for review by the Engineer. The decision of
equality of a proposed substitution rests fully with the Engineer.

Certain new equipment and systems have been specified with one or more
make(s) WITHOUT the phrase "or equal". In such cases, only one of the
manufactured products listed will be allowed. No other manufacturer is
allowed.

Finance Committee - Agenda - 6/7/2017 - P295

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P295

1.3

16010-7
ELECTRICAL - GENERAL

American National Standards Institute.

National Electrical Code (NEC).

Local Power Company.

Local Telephone Company

. OSHA

Finance Committee - Agenda - 6/7/2017 - P294

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P294

16010-6
ELECTRICAL - GENERAL

Phase B - Red Phase B - Red/(Blue) Phase B - Brown
Phase C - Blue Phase C - Orange

e. For Conductors No. 6 and smaller, color coding shall correspond to the
color of the conductor insulation. For color coding of wire larger than
No. 6, use self-adhesive, wrap-around type markers. These markers shall
be used at all panelboards, junction boxes, disconnect switches, circuit
breakers, etc.

Finance Committee - Agenda - 6/7/2017 - P293

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P293

4.

16010-5
ELECTRICAL - GENERAL

Secure and pay for all permits, fees and licenses necessary for the proper
execution of the work under DIVISION 16.

Tests and Procedures Prior To Start-up:

Refer to Section 16950 - Testing Electrical Systems and start-up for testing and
scheduling requirements.

Demonstration of Complete Electrical Systems:

1.

2

Finance Committee - Agenda - 6/7/2017 - P292

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P292

5.

1.

16010-4
ELECTRICAL - GENERAL

required to modify these changes along with all requirements for installation
of the new work, as shown on the Contract Drawings.

Finance Committee - Agenda - 6/7/2017 - P291

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P291

16010-3
ELECTRICAL - GENERAL

e. Provide complete branch circuit wiring systems including all raceways,
conductors, cables, outlet and junction boxes, wiring devices and device
connections as shown on the Drawings and as specified herein.

G. Work Specified Elsewhere:

1.

2.

The materials and methods used for all Electrical Work indicated in the

Contract Documents shall meet the requirements specified in Division 16.

The following Electrical Work and Work relating to the Electrical Work will

Finance Committee - Agenda - 6/7/2017 - P290

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P290

16010-2
ELECTRICAL - GENERAL

F. Work Specified Herein:

1.

Visit and examine the project site and become familiar with all existing
conditions pertinent to the work to be performed thereon. No additional
compensation will be allowed for failure to be so informed. This contractor is
responsible to be familiarized with the conditions of the project during the
bidding period in order to bring any clarifications or issues to the attention of
the Engineer prior to submission of his/her final bid price.

Finance Committee - Agenda - 6/7/2017 - P289

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P289

16010-1
SECTION 16010

ELECTRICAL - GENERAL

PART 1 - GENERAL

1.1

DESCRIPTION

A.

Provide all labor, materials, equipment, operations, methods and procedures as
indicated in the Contract Documents, together with all items necessary for or
incidental to the completion of the work.

All systems or additions to existing systems indicated in the Contract Documents

shall mean all necessary supervision, labor, equipment and materials required to

provide complete, properly functioning systems.

Finance Committee - Agenda - 6/7/2017 - P288

By dnadmin on Mon, 11/07/2022 - 10:23
  • Read more about Finance Committee - Agenda - 6/7/2017 - P288

5. Q:

R:
6. Q:

R:
7. Q:

R:
13089K

Clarify if offices will be relocated while installing lights and new ceilings. Will contractor be
responsible for relocating things, installing temporary heaters and or AC units?

Pagination

  • Previous page ‹‹
  • Page 1267
  • Next page ››
Subscribe to Agenda

Footer menu

  • Contact